Ferrybridge Multifuel 2 (FM2): Difference between revisions
m expanded text |
m →Summary: Tonnage amendment |
||
| Line 4: | Line 4: | ||
==Summary== | ==Summary== | ||
An [[EfW]] facility based upon conventional combustion technology and not yet considered an [[ERF]] as it does not yet have [[R1]] status, whilst the neighbouring FM2 does. Ferrybridge FM2 has permitted operational capacity of | An [[EfW]] facility based upon conventional combustion technology and not yet considered an [[ERF]] as it does not yet have [[R1]] status, whilst the neighbouring FM2 does. Ferrybridge FM2 has permitted operational capacity of 675,000 tonnes per annum, and is owned and operated by [[Multifuel Energy Ltd]] a 50:50 joint venture between [[Wheelabrator]] and [[SSE]]. Delivery of waste is primarily by road, and the facility processes primarily [[RDF]] but is able to process a range of other [[Waste Derived Fuel]], hence its 'Multifuel' name<ref>[https://www.wtienergy.co.uk/plant-locations/development/ferrybridge-multifuel-2-fm2-west-yorkshire Wheelabrator Website]</ref>. | ||
==History== | ==History== | ||