Dundee EfW CHP Facility: Difference between revisions
m →Plant |
m →Plant: additon of refernce |
||
| Line 12: | Line 12: | ||
The facility is due to incorporate grate incineration technology with steam from the process due to be used as a source of heat for for nearly Michelin tyre production factory. | The facility is due to incorporate grate incineration technology with steam from the process due to be used as a source of heat for for nearly Michelin tyre production factory. | ||
The building has been designed to measure 134m in length and 38m in height, with an exhaust stack measuring 90m. | The building has been designed to measure 134m in length and 38m in height, with an exhaust stack measuring 90m.<ref>https://www.letsrecycle.com/news/latest-news/mvv-secures-permission-for-dundee-erf/</ref> | ||
==Local Authority Users== | ==Local Authority Users== | ||