Milton Keynes Waste Recovery Park

From Wikiwaste
Revision as of 17:04, 7 February 2020 by Bin52 (talk | contribs) (add picture and link)
Amey Cespa Milton Keynes Waste Recovery Park
Amey Cespa Milton Keynes Waste Recovery Park


Error: no local variable "site" has been set.
Error: no local variable "status" has been set.
Site Location
Site Location

See Residual EfW → page for a larger UK Wide map.

Waste Licence Error: no local variable "epr" has been set.
Operator [[Error: no local variable "operator" has been set.]]
Region [[:Category:Error: no local variable "region" has been set.|Error: no local variable "region" has been set.]]
Operational Capacity Error: no local variable "cap" has been set.ktpa
Is site R1? Error: no local variable "r1" has been set.
When was R1 Granted? Error: no local variable "r1date" has been set.
What was the R1 value Error: no local variable "r1value" has been set.
Electrical Capacity Error: no local variable "mwe" has been set.MWe
Number of Lines Error: no local variable "line" has been set.
Number of Turbines Error: no local variable "turbine" has been set.
CHP Error: no local variable "chp" has been set.
Technology Approach Error: no local variable "techtype" has been set.
Funding Type [[Error: no local variable "funding" has been set.]]

Operators Annual Report


Input Data

Year HH C&I Clin RDF Total
2016 0.00 0.00 0.00 0.00 0.00
2017 0.00 0.00 0.00 0.00 0.00
2018 71493.20 203.80 0.00 0.00 75340.46
2019 112486.00 0.00 0.00 0.00 115863.00
2020 117088.00 0.00 0.00 0.00 120404.00
2021 113573.00 0.00 0.00 0.00 116609.00
2022 108124.00 0.00 0.00 0.00 111969.00


Output Data

Year IBA IBA %ge of Tot IN APC APC %ge of Tot IN
2016 0.00 0.00% 0.00 0.00%
2017 0.00 0.00% 0.00 0.00%
2018 4387.64 5.82% 1523.67 2.02%
2019 12760.00 11.01% 3131.00 2.70%
2020 11044.00 9.17% 3412.00 2.83%
2021 10900.00 9.35% 2886.00 2.47%
2022 11473.00 10.25% 3062.00 2.73%

Summary

History

Plant

Local Authority Users

References