North London Heat and Power (Edmonton EcoPark Replacement)
Error: no local variable "site" has been set. Error: no local variable "status" has been set. | |
See Residual EfW → page for a larger UK Wide map. | |
Waste Licence | Error: no local variable "epr" has been set. |
Operator | [[Error: no local variable "operator" has been set.]] |
Region | [[:Category:Error: no local variable "region" has been set.|Error: no local variable "region" has been set.]] |
Operational Capacity | Error: no local variable "cap" has been set.ktpa |
Is site R1? | Error: no local variable "r1" has been set. |
When was R1 Granted? | Error: no local variable "r1date" has been set. |
What was the R1 value | Error: no local variable "r1value" has been set. |
Electrical Capacity | Error: no local variable "mwe" has been set.MWe |
Number of Lines | Error: no local variable "line" has been set. |
Number of Turbines | Error: no local variable "turbine" has been set. |
CHP | Error: no local variable "chp" has been set. |
Technology Approach | Error: no local variable "techtype" has been set. |
Funding Type | [[Error: no local variable "funding" has been set.]] |
Operators Annual Report
Input Data
Year | HH | C&I | Clin | RDF | Total |
---|
Output Data
Year | IBA | IBA %ge of Tot IN | APC | APC %ge of Tot IN |
---|
Summary
An EfW facility based upon conventional combustion technology and presently in early stage construction. North London Heat and Power replaces the end of life Edmonton EcoPark EfW facility on the same site, at a forecast operational capacity of 700,000 tonnes per annum vs the current 675,000 tonnes per annum.
Technology
The plant technology has not yet been published.
Construction
The plant commenced construction with initial ground preparation works in January 2019 by . A legal challenge has been raised by on the development. ref>Letsrecycle Article</ref>.
Waste Input
The plant is intended to run on residual Household Waste and Commercial Waste. The majority of supply will continue to be underpinned by NLWA.