An EfW facility based upon conventional combustion technology, located at the site of the old coal fired power station in Ratcliffe-on-Soar. The EMERGE EfW Plant is forecast to have a capacity of c.500,000 tonnes per annum generating 49.9MW with around 43.4MW of electricity exported.


Error: no local variable "site" has been set.
Error: no local variable "status" has been set.
Site Location
Site Location

See Residual EfW → page for a larger UK Wide map.

Waste Licence Error: no local variable "epr" has been set.
Operator [[Error: no local variable "operator" has been set.]]
Region [[:Category:Error: no local variable "region" has been set.|Error: no local variable "region" has been set.]]
Operational Capacity Error: no local variable "cap" has been set.ktpa
Is site R1? Error: no local variable "r1" has been set.
When was R1 Granted? Error: no local variable "r1date" has been set.
What was the R1 value Error: no local variable "r1value" has been set.
Electrical Capacity Error: no local variable "mwe" has been set.MWe
Number of Lines Error: no local variable "line" has been set.
Number of Turbines Error: no local variable "turbine" has been set.
CHP Error: no local variable "chp" has been set.
Technology Approach Error: no local variable "techtype" has been set.
Funding Type [[Error: no local variable "funding" has been set.]]

Operators Annual Report


Input Data

Year HH C&I Clin RDF Total


Output Data

Year IBA IBA %ge of Tot IN APC APC %ge of Tot IN

Computer Generated image of EMERGE EfW, all rights reserved
Computer Generated image of EMERGE EfW, all rights reserved


Summary

An EfW facility based upon conventional combustion technology, located at the site of the old coal fired power station in Ratcliffe-on-Soar. The EMERGE EfW Plant is forecast to have a capacity of c.500,000 tonnes per annum generating 49.9MW with around 43.4MW of electricity exported. The site has been developed by Uniper with planning consent granted in July 2021[1] and the Environmental Permit consultation running between January and February 2022[2].

The Uniper website suggests construction would commence 2023, with full commercial operation in early 2026[3].

Technology

The moving-grate combustion technology is not defined as yet in the public domain or in the Environmental Permit application. The design set out in the Environmental Permit draft decision notice is based upon 7,884 hours per year of operation at a nominal 33 tonnes per line (equating to 2 lines) with a R1 rating of 0.76 (classifying it as Recovery facility).

Construction

The EPC and Operational and Management arrangements are not presently in the public domain.

Waste Input

The facility Environmental Permit maximum tonnage is 524,550 tonnes per annum, with the planning document suggesting a target tonnage of 472,100 tonnes per annum at the target NCV. It is anticipated to accept residual waste as feedstock, RDF and potential residues from treatment processes including AD and MBT.