Ferrybridge Multifuel 1 (FM1)
Ferrybridge Multifuel 1 (FM1) Operational | |
See Residual EfW → page for a larger UK Wide map. | |
Waste Licence | SP3239FU |
Operator | Enfinium Ferrybridge 1 Ltd |
Region | Yorkshire and the Humber |
Operational Capacity | 725ktpa |
Is site R1? | fal |
When was R1 Granted? | 2017-05-07 |
What was the R1 value | 0.80 |
Electrical Capacity | 73.00MWe |
Number of Lines | 2 |
Number of Turbines | 1 |
CHP | No |
Technology Approach | EfW |
Funding Type | PPP |
Operators Annual Report
Input Data
Year | HH | C&I | Clin | RDF | Total |
---|---|---|---|---|---|
2016 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
2017 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
2018 | 0.00 | 0.00 | 0.00 | 647085.00 | 647085.00 |
2019 | 666942.00 | 0.00 | 0.00 | 0.00 | 666942.00 |
2020 | 0.00 | 0.00 | 0.00 | 599367.00 | 599367.00 |
2021 | 0.00 | 0.00 | 0.00 | 656414.00 | 656414.00 |
2022 | 0.00 | 619106.00 | 0.00 | 0.00 | 619106.00 |
2023 | 0.00 | 0.00 | 0.00 | 649546.00 | 649546.00 |
Output Data
Year | IBA | IBA %ge of Tot IN | APC | APC %ge of Tot IN |
---|---|---|---|---|
2016 | 119760.00 | 0.00% | 22824.00 | 0.00% |
2017 | 125051.00 | 0.00% | 25822.00 | 0.00% |
2018 | 128112.00 | 19.80% | 27070.00 | 4.18% |
2019 | 129216.00 | 19.37% | 27342.00 | 4.10% |
2020 | 113506.00 | 18.94% | 24996.00 | 4.17% |
2021 | 127477.00 | 19.42% | 26699.00 | 4.07% |
2022 | 119636.00 | 19.32% | 26307.00 | 4.25% |
2023 | 124770.00 | 19.21% | 24629.00 | 3.79% |