Ferrybridge Multifuel 1 (FM1)

Revision as of 14:28, 3 February 2020 by Admin (talk | contribs) (Imported from text file)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)


Ferrybridge Multifuel 1 (FM1)
Operational
Site Location
Site Location

See Residual EfW → page for a larger UK Wide map.

Waste Licence SP3239FU
Operator Enfinium Ferrybridge 1 Ltd
Region Yorkshire and the Humber
Operational Capacity 725ktpa
Is site R1? fal
When was R1 Granted? 2017-05-07
What was the R1 value 0.80
Electrical Capacity 73.00MWe
Number of Lines 2
Number of Turbines 1
CHP No
Technology Approach EfW
Funding Type PPP

Operators Annual Report


Input Data

Year HH C&I Clin RDF Total
2016 0.00 0.00 0.00 0.00 0.00
2017 0.00 0.00 0.00 0.00 0.00
2018 0.00 0.00 0.00 647085.00 647085.00
2019 666942.00 0.00 0.00 0.00 666942.00
2020 0.00 0.00 0.00 599367.00 599367.00
2021 0.00 0.00 0.00 656414.00 656414.00
2022 0.00 619106.00 0.00 0.00 619106.00
2023 0.00 0.00 0.00 649546.00 649546.00


Output Data

Year IBA IBA %ge of Tot IN APC APC %ge of Tot IN
2016 119760.00 0.00% 22824.00 0.00%
2017 125051.00 0.00% 25822.00 0.00%
2018 128112.00 19.80% 27070.00 4.18%
2019 129216.00 19.37% 27342.00 4.10%
2020 113506.00 18.94% 24996.00 4.17%
2021 127477.00 19.42% 26699.00 4.07%
2022 119636.00 19.32% 26307.00 4.25%
2023 124770.00 19.21% 24629.00 3.79%

Summary

History

Plant

Local Authority Users

References