Bolton TRF

Revision as of 16:45, 7 February 2020 by Bin52 (talk | contribs) (add picture and link)
Bolton EFW
Bolton EFW


Bolton TRF
Operational
Site Location
Site Location

See Residual EfW → page for a larger UK Wide map.

Waste Licence BS3042IM
Operator SUEZ
Region North West
Operational Capacity 128ktpa
Is site R1? fal
When was R1 Granted?
What was the R1 value 0.00
Electrical Capacity 10.80MWe
Number of Lines 1
Number of Turbines 1
CHP Yes
Technology Approach EfW
Funding Type PFI

Operators Annual Report


Input Data

Year HH C&I Clin RDF Total
2016 85800.31 587.82 0.00 0.00 86388.85
2017 49444.90 756.32 0.00 0.00 50202.32
2018 28179.35 1296.16 0.00 0.00 29475.51
2019 0.00 87489.00 0.00 0.00 88211.00
2020 65478.00 0.00 0.00 0.00 65478.00
2021 81388.00 0.00 0.00 0.00 81388.00
2022 72117.00 0.00 0.00 0.00 72117.00
2023 88101.00 0.00 0.00 0.00 88101.00


Output Data

Year IBA IBA %ge of Tot IN APC APC %ge of Tot IN
2016 17602.00 20.38% 3169.00 3.67%
2017 10607.00 21.13% 1927.00 3.84%
2018 3755.93 12.74% 711.44 2.41%
2019 16044.00 18.19% 3077.00 3.49%
2020 13670.00 20.88% 2159.00 3.30%
2021 11389.00 13.99% 1904.00 2.34%
2022 13294.00 18.43% 2131.00 2.95%
2023 18445.00 20.94% 2793.00 3.17%

Summary

History

Plant

Local Authority Users

References