The production of cement utilizes waste materials in two primary ways, firstly using specific Industrial Waste and Mining & Quarrying Waste (and waste from the kiln part of the process itself) as additives and replacement for traditional raw materials, and secondly as a fuel to substitute for the use of traditional fossil fuels in a cement kiln. In 2018 1,414,195 tonnes of waste was used as raw materials and fuel in the production of cement, with just over 43% of kiln thermal input replaced by Waste Derived Fuel. The five companies manufacturing cement together supplied 78% of the cement consumed in the market in 2018. [1]

Picture of Rotart Cement Kiln: source zkg.de
Picture of Rotart Cement Kiln: source zkg.de

_TOC_

The Process

There are six main stages of cement manufacture[2]:

  • Stage 1 - Raw Material Extraction: raw ingredients include limestone, sand and clay, shale, fly ash, mill scale and bauxite. Materials are mined, crushed and reduced in size.
  • Stage 2 - Grinding, Proportioning and Blending: the production of a fine homogeneous mix with additives that comprises primarily around 80% limestone and 20% clay.
  • Stage 3 - Pre-heating Raw Material: a pre-heating chamber using kiln 'exhaust' gases to reduce energy consumption and pre-condition the raw material into oxides.
  • Stage 4 - Kiln Phase: the principle phase which produces a clinker, exiting the kiln in marble-sized nodules - it is the binder that is used in cement products.
  • Stage 5 - Cooling and Final Grinding: the clinker is rapidly air-cooled and gypsum (and other active ingredients as required) is added to the clinker and ground to a fine power to produce cement
  • Stage 6 - Packing and Shipping: the cement is conveyed from grinding mills to silos where it is then packed in bags.

Not all cement kilns have the total 'end to end' process on site, with some sites producing the clinker for subsequent grinding, blending and packing at a different site. This might include, for example, the introduction of other materials, such as Blast Furnace Slag to produce a Blast Furnace Cement - a highly sulphate resistant cement that can have up to 65% granulated Blast Furnace Slag mixed with the clinker.

Use of Waste - Historical Context

The introduction of waste materials - or 'Alternative Raw Materials' as coined by the industry - can be as part of the kiln phase or the final grinding stage and it can be used as an additive or as a fuel in the process.

In 1995 there were 20 'cement factories' in the UK producing around 15 million tonnes a year of cement each year, with the cost of energy in the process representing 40 to 50% of running costs. There was a drive to substitute traditional fuels (coal and petroleum coke) with cheaper fuels slightly before this date, and trials were still running at this time with the ramifications of these trials captured in a Parliamentary Briefing Note[3]. Waste Derived Fuel had already started to play a more significant role in UK cement processing, in line with other countries (especially in Europe). It started with the use of solvent based hazardous wastes, named by some operators 'Chemfuel', which was being trialed at a substitution of 50% of traditional coal fuel (although at the time 100% substitution occurred in Belgium). At around the same time shredded/chipped waste tyres were starting to also be used in some cement kilns as a Waste Derived Fuel as both the solvent based wastes and tyres had a high CV and attracted an income from taking them into a cement kiln. By 1998 the MPA reports that 446,511 tonnes of waste by-products were used as fuel and raw materials, accounting for 4% of cement production and the proportion of fuel comprising waste was 5.7%Cite error: The opening <ref> tag is malformed or has a bad name.

Cement kilns are an option for disposing of hazardous materials because:

  • the temperatures in the kiln, which are much higher than in other combustion systems (e.g. incinerators),
  • the alkaline conditions in the kiln, afforded by the high-calcium input mix or rawmix, which can absorb acidic combustion products,
  • the ability of the clinker to absorb heavy metals into its structure[4]

By 2005 the range of alternative fuels had expanded in Europe to include tyres, plastic, paper, Refuse Derived Fuel, dried sewage sludge, meat and bone meal and some other waste streams, with fuel costs typically accounting for 30 to 40% of operating costs[5]. This was driven by the cement industry looking to reduce its costs and carbon emissions, and by changes in the waste sector around the Landfill Directive and the introduction of the Landfill Tax which made cement kilns an alternative outlet for suitably prepared waste materials/Waste Derived Fuel.

By 2010 the MPA reports that 1,528,315 tonnes of waste by-products were used as fuel and raw materials in UK cement manufacture, accounting for 7.2% of cement production and the proportion of fuel comprising waste was 39.7%Cite error: The opening <ref> tag is malformed or has a bad name.

By 2018 the MPA reported there were 12 cement kilns, with 1,414,195 tonnes of recycled content in UK cement manufacture, equivalent to almost 10% of cement production 2018. This same report notes that since 2013 the total waste used has not varied by much more than +/-150,000 tonnes per year, and the proportion fuel comprising waste was 43% in 2018 and has not changed by much more than +/- 1.5% since 2013Cite error: The opening <ref> tag is malformed or has a bad name.

In addition to the use of Waste Derived Fuel in UK cement kilns RDF, and more commonly SRF due to its higher CV and more stringent specification, has been increasingly exported from the UK to Europe since 2009. This has been driven by demand in Europe, combined with a flat demand in the UK cement kilns, and an increasing Landfill Tax that has has made export commercially viable/attractive.

List of UK Cement Kilns

More detailed information can be found by clicking through to the site-specific page:

Cement Kilns in the UK
Cement Kilns in the UK
ID Site Name Operating Company

1. Aberthaw Cement Kiln Tarmac
2. Cauldon Cement Kiln Aggregate Industries t/a Lafarge Cement
3. Cookstown Cement Kiln Aggregate Industries t/a Lafarge Cement
4. Tarmac Ltd, Dunbar Plant Tarmac
5. Hope Cement Kiln Breedon Cement
6. Ketton Cement Kiln Hanson Cement
7. Padeswood Cement Kiln Hanson Cement
8. Ribblesdale Cement Kiln Hanson Cement
9. Rugby Cement Kiln Cemex
10. South Ferriby Cement Kiln Cemex
11. Tunstead Cement Kiln Tarmac
12. Purfleet Cement Kiln Kerneos
13. Tilbury Cement and Ash Plant Cemex
14. Dagenham Cement Depot Breedon Cement
15. Dewsbury Cement Depot Breedon Cement
16. Reading (Theale) Cement Depot & Concrete Plant Breedon Cement
17. Walsall Cement & Aggregates Depot Breedon Cement
18. Barnstone Cement Plant Tarmac
19. Celtic Ash Tarmac
20. Tarmac Northfleet Works Tarmac
21. Seaham Depot Tarmac
22. ScotAsh Tarmac
23. Tarmac Thurrock Wharf Tarmac


Use of Waste - Current Context

The UK cement kilns, on the whole, have waste permits and complete returns of the waste handled each quarter. The most recent data for each site is listed in the site specific page per cement kiln, although no returns have been made/are available for Cookstown, Purfleet and Dunbar. An analysis of the waste returns for 2018 totals 753,784 tonnes - out of the 1,414,195 tonnes reported by the MPACite error: The opening <ref> tag is malformed or has a bad name. The difference can be accounted for via several factors:

  • There are no returns for 3 cement kilns
  • The material may not be captured by the waste reports [6]
  • The grinding and blending sites are excluded from the analysis


From the information that is available, the following breakdown for cement kilns is as follows:

EWC Code Waste Description Tonnes (2018)
01 04 08 waste gravel and crushed rocks other than those mentioned in 01 04 07 796
02 02 02 animal-tissue waste - the code typically used for MBM 1,639
02 02 03 materials unsuitable for consumption or processing 8,360
06 02 01* calcium hydroxide 1,189
10 01 02 coal fly ash 180,493
10 01 15 bottom ash, slag and boiler dust from co-incineration other than those mentioned in 10 01 14 384
10 02 13* sludges and filter cakes from gas treatment containing dangerous substances 24,172
16 01 03 end-of-life tyres 69,224
16 08 04 spent fluid catalytic cracking catalysts (except 16 08 07) 2,509
19 01 13* fly ash containing dangerous substances 29
19 02 08* liquid combustible wastes containing dangerous substances 84,249
19 02 10 combustible wastes other than those mentioned in 19 02 08 and 19 02 09 18,643
19 08 05 sludges from treatment of urban waste water 25,522
19 08 13* sludges containing dangerous substances from other treatment of industrial waste water 3,412
19 09 02 sludges from water clarification 3,773
19 12 01 paper and cardboard 5,226
19 12 04 plastic and rubber 5,469
19 12 10 combustible waste (refuse derived fuel) - the code typically used for SRF 251,730
19 12 11* other wastes (including mixtures of materials) from mechanical treatment of waste containing dangerous substances 100
19 12 12 other wastes (including mixtures of materials) from mechanical treatment of wastes other than those mentioned in 19 12 11 66,865

In the table above the EWC code for the waste is shown as well as the description - Hazardous Waste is signified by entries where the six-digit EWC code is marked by an asterisk (*). Note that the two codes 19 12 10(SRF) and [[EWCChap19|19 12 12 (generally RDF, but can be used to describe process fines by some operators) which together account for 318,595 tonnes (or 42% of the tonnage recorded) and comes primarily from the processing of Residual Waste. The other primary codes used as fuel are 19 02 08* (the solvent based fuels) and 16 01 03 (waste tyres) which together account for 153,474 tonnes (or 20% of the tonnage recorded) meaning that of the 753,783 tonnes recorded in 2018, 62% were from 4 waste types that all were used as fuel in the cement process.

List of UK Grinding and Blending Sites

The following sites are listed as grinding and blending sites only, with no cement kiln on siteCite error: The opening <ref> tag is malformed or has a bad name:

Site Company Process
Tilbury Cemex Grinding and Blending
Dagenham Breeden Blending only
Dewsbury Breeden Blending only
Theale Breeden Blending only
Walsall Breedon Blending only
Barnstone Tarmac Grinding only
Celtic Ash Tarmac Blending only
Northfleet Tarmac Blending only
Seaham Tarmac Blending only
Scotash Tarmac Blending only
West Thorrock Tarmac Blending only


References

  1. MPA Cement Sustainability Report 2019
  2. https://civiltoday.com/civil-engineering-materials/cement/106-cement-manufacturing-process
  3. Parlimentary Briefing Note 60 April 1995
  4. Wikipedia Entry
  5. Environment Agency Science report on Solid Waste Derived Fuels in Cement Kilns, an International perspective
  6. As an example, Blast Furnace Slag is considered a primary input for this type of cement, it is not defined as waste by the producer and therefore is not normally captured in UK Waste Tonnage figures or waste permit returns