UPM Shotton Boiler 7
Error: no local variable "site" has been set. Error: no local variable "status" has been set. | |
See Biomass EfW → page for a larger UK Wide map. | |
Operator | Error: no local variable "operator" has been set. |
Capacity | Error: no local variable "capacity" has been set. MWe |
Feedstock | Error: no local variable "mainfeed" has been set. |
EPR (Waste Licence) | Error: no local variable "epr" has been set. |
ROC | Error: no local variable "roc" has been set. |
CfD | Error: no local variable "cfdcap" has been set. |
CHP | Error: no local variable "chp" has been set. |
Operators Annual Report
Input Data
Year | Wood | Litter | RDF | Other | Total |
---|
Output Data
Year | IBA | IBA %ge of Tot IN | APC | APC %ge of Tot IN |
---|
Summary
A Biomass Waste CHP EFW based at the UPM Shotton newsprint mill in Flintshire, north Wales generating 24.8 MWe[1] from a feedstock of waste paper, fibre and sludge[2]. The plant provides up to 70% of the paper mill's energy production[1]. Most of the energy is consumed in the manufacture of mechanical pulp, pumping and paper drying[3]. In 2016 a second steam turbine was brought on line at the facility which utilises excess steam from the biomass CHP plant[4].