South Clyde Energy Centre, Bogmoor Road, Glasgow
An EfW facility based upon conventional combustion technology that reached financial close in July 2022. South Clyde has a forecast operational capacity of 350,000 tonnes per annum. The project is owned 50/50 by Macquarie Asset Management's Green Investment Group and Fortum Glasgow a subsidiary of Fortum Oyj[1] .
Tilbury Docks - Phase 2 (EfW) Planning | |
See Residual EfW → page for a larger UK Wide map. | |
Waste Licence | Tbc36 |
Operator | Thameside Energy Recovery Facility Ltd |
Region | Eastern |
Operational Capacity | 350ktpa |
Is site R1? | fal |
When was R1 Granted? | |
What was the R1 value | 0.00 |
Electrical Capacity | 36.40MWe |
Number of Lines | 0 |
Number of Turbines | 0 |
CHP | No |
Technology Approach | EfW |
Funding Type | [[]] |
Operators Annual Report
Input Data
Year | HH | C&I | Clin | RDF | Total |
---|
Output Data
Year | IBA | IBA %ge of Tot IN | APC | APC %ge of Tot IN |
---|
Summary
An EfW facility based upon conventional combustion technology that reached financial close in July 2022. South Clyde has a forecast operational capacity of 350,000 tonnes per annum, with a capability of a maximum of 385,440 tonnes. The project is owned 50/50 by Macquarie Asset Management's Green Investment Group and Fortum Glasgow a subsidiary of Fortum Oyj.
Technology
The plant technology will comprise a single line of a standard moving grate technology, processing around 44 tonnes per hour of waste and producing super-heated steam and 40MWe with a net export of 35MWe and 12MWth of heat[2]. The grate and boiler was reported in July 2022 as being delivered by Hitachi Zosen Inova Steinmüller[3].
Construction
The plant will be constructed under an EPCM arrangement with AFRY in co-operation with AFRY Solutions UK Ltd and AFRY Finland Oy.
Waste Input
The plant is intended to run on residual Household Waste and Commercial Waste with NCV of between 8 to 15MJ/kg (with an average of 10MJ/kg) sourced from within Glasgow City and within the Clyde Valley[4].
References
- ↑ Macquarie Media release 22nd July 2022
- ↑ Permit Application to SEPA
- ↑ Linked in Article accessed 22nd July 2022
- ↑ Non-technical Summary accompanying permit application