Bolton TRF
Bolton TRF Operational | |
See Residual EfW → page for a larger UK Wide map. | |
Waste Licence | BS3042IM |
Operator | SUEZ |
Region | North West |
Operational Capacity | 128ktpa |
Is site R1? | fal |
When was R1 Granted? | |
What was the R1 value | 0.00 |
Electrical Capacity | 10.80MWe |
Number of Lines | 1 |
Number of Turbines | 1 |
CHP | Yes |
Technology Approach | EfW |
Funding Type | PFI |
Operators Annual Report
Input Data
Year | HH | C&I | Clin | RDF | Total |
---|---|---|---|---|---|
2016 | 85800.31 | 587.82 | 0.00 | 0.00 | 86388.85 |
2017 | 49444.90 | 756.32 | 0.00 | 0.00 | 50202.32 |
2018 | 28179.35 | 1296.16 | 0.00 | 0.00 | 29475.51 |
2019 | 0.00 | 87489.00 | 0.00 | 0.00 | 88211.00 |
2020 | 65478.00 | 0.00 | 0.00 | 0.00 | 65478.00 |
2021 | 81388.00 | 0.00 | 0.00 | 0.00 | 81388.00 |
2022 | 72117.00 | 0.00 | 0.00 | 0.00 | 72117.00 |
2023 | 88101.00 | 0.00 | 0.00 | 0.00 | 88101.00 |
Output Data
Year | IBA | IBA %ge of Tot IN | APC | APC %ge of Tot IN |
---|---|---|---|---|
2016 | 17602.00 | 20.38% | 3169.00 | 3.67% |
2017 | 10607.00 | 21.13% | 1927.00 | 3.84% |
2018 | 3755.93 | 12.74% | 711.44 | 2.41% |
2019 | 16044.00 | 18.19% | 3077.00 | 3.49% |
2020 | 13670.00 | 20.88% | 2159.00 | 3.30% |
2021 | 11389.00 | 13.99% | 1904.00 | 2.34% |
2022 | 13294.00 | 18.43% | 2131.00 | 2.95% |
2023 | 18445.00 | 20.94% | 2793.00 | 3.17% |