Trident Park (Cardiff ERF)

From Wikiwaste
Revision as of 17:48, 3 February 2020 by Bin52 (talk | contribs) (add page specific text)


Trident Park (Cardiff ERF)
Operational
Site Location
Site Location

See Residual EfW → page for a larger UK Wide map.

Waste Licence LP3030XA
Operator Viridor
Region Wales
Operational Capacity 425ktpa
Is site R1? fal
When was R1 Granted?
What was the R1 value 0.00
Electrical Capacity 30.00MWe
Number of Lines 2
Number of Turbines 1
CHP Yes
Technology Approach EfW
Funding Type PPP

Operators Annual Report


Input Data

Year HH C&I Clin RDF Total
2016 0.00 0.00 0.00 0.00 0.00
2017 0.00 0.00 0.00 0.00 0.00
2018 0.00 0.00 0.00 0.00 0.00
2019 272459.00 97287.00 0.00 0.00 369746.00
2020 276146.00 96789.00 5597.00 872.00 379404.00
2021 274829.00 99409.00 4164.00 0.00 378402.00
2022 247187.00 107313.00 5689.00 0.00 360189.00
2023 248500.00 155785.00 0.00 0.00 404285.00


Output Data

Year IBA IBA %ge of Tot IN APC APC %ge of Tot IN
2016 0.00 0.00% 0.00 0.00%
2017 0.00 0.00% 0.00 0.00%
2018 0.00 0.00% 0.00 0.00%
2019 201.18 0.05% 32.65 0.01%
2020 66547.00 17.54% 5573.00 1.47%
2021 75423.00 19.93% 8600.00 2.27%
2022 66868.00 18.56% 3859.00 1.07%
2023 71466.00 17.68% 4481.00 1.11%

Summary

An EfW facility based upon conventional combustion technology and considered an ERF based on its R1 status. Trident Park has permitted operational capacity of 425,000 tonnes per annum, operated and owned by Viridor. Delivery of waste is by road and and the facility processes primarily residual Household Waste and some Commercial Waste[1]






History

The Ardley facility was built primarily to service a 25 year PPP contract signed in March 2011 with Oxfordshire County Council, with anticipated total throughput of up to 326,000 tonnes per annum - receiving additional residual Commercial Waste and some Household Waste from other local authorities. It is located on Viridor's Landfill near Bicester, close to the M40, and with the opening of the facility Viridor announced the closure of the adjacent Landfill in 2014.

Plant

Built by a JV between CNIM and Clugson under a Design & Build EPC-turnkey contract which started in March 2011 and was delivered in November 2014[2] at a reported [3] £220m capital cost. The plant comprises 2 lines of 20 tonnes/hour design capacity capable of treating 300,000 tonnes per annum via standard combustion technology generating super-heated steam, and is configured to run on primarily residual Household Waste

Local Authority Users

References