Allerton Waste Recovery Park (EfW)

From Wikiwaste
Revision as of 14:46, 10 February 2020 by Bin52 (talk | contribs) (Update links)
Amey Cespa Allerton
Amey Cespa Allerton


Error: no local variable "site" has been set.
Error: no local variable "status" has been set.
Site Location
Site Location

See Residual EfW → page for a larger UK Wide map.

Waste Licence Error: no local variable "epr" has been set.
Operator [[Error: no local variable "operator" has been set.]]
Region [[:Category:Error: no local variable "region" has been set.|Error: no local variable "region" has been set.]]
Operational Capacity Error: no local variable "cap" has been set.ktpa
Is site R1? Error: no local variable "r1" has been set.
When was R1 Granted? Error: no local variable "r1date" has been set.
What was the R1 value Error: no local variable "r1value" has been set.
Electrical Capacity Error: no local variable "mwe" has been set.MWe
Number of Lines Error: no local variable "line" has been set.
Number of Turbines Error: no local variable "turbine" has been set.
CHP Error: no local variable "chp" has been set.
Technology Approach Error: no local variable "techtype" has been set.
Funding Type [[Error: no local variable "funding" has been set.]]

Operators Annual Report


Input Data

Year HH C&I Clin RDF Total
2016 0.00 0.00 0.00 0.00 0.00
2017 0.00 0.00 0.00 0.00 0.00
2018 222732.68 0.00 0.00 6693.00 243520.78
2019 256001.00 0.00 0.00 0.00 256001.00
2020 0.00 0.00 0.00 0.00 0.00
2021 287485.00 0.00 0.00 0.00 294009.00
2022 271746.00 7882.00 0.00 0.00 286293.00


Output Data

Year IBA IBA %ge of Tot IN APC APC %ge of Tot IN
2016 0.00 0.00% 0.00 0.00%
2017 0.00 0.00% 0.00 0.00%
2018 55464.84 22.78% 8274.35 3.40%
2019 54423.00 21.26% 9105.00 3.56%
2020 0.00 0.00% 0.00 0.00%
2021 61695.00 20.98% 10208.00 3.47%
2022 60655.00 21.19% 9397.00 3.28%

Summary

An EfW facility based upon conventional combustion technology and considered an ERF based on its R1 status. The Allerton site has permitted operational capacity of 320,000 tonnes per annum, and is operated by AmeyCespa. Delivery of waste is by road and the facility processes primarily residual Household Waste and some Commercial Waste[1].

History

The Allerton facility was built primarily to service a 25 year PPP contract signed in 2010 between and North Yorkshire County Council and York City Council, for 230,000 tones per annum of the anticipated total throughput of up to 320,000 tonnes per annum. The plant has an integrated Mechanical Biological Treatment process with mechanical sorting of organics for subsequent processing in Anaerobic Digestion and then EfW of the RDF material produced[2].

Plant

Built by Vinci Environment UK (a 50/50 subsidiary of Vinci Construction UK and Vinci Environment) under a Design & Build-turnkey contract, construction started in early 2015 and was completed in March 2018 at a reported[3] GBP £183m capital cost. The plant comprises 2 lines of 20 tonnes/hour with a design capacity capable of treating 330,000 tonnes per annum via standard combustion technology, air cooled, Vinci Grate, generating super-heated steam, and is configured to run on residual Household Waste and Commercial Waste delivering 25 MWe of power[4].

Local Authority Users

References