Allerton Waste Recovery Park (EfW): Difference between revisions

From WikiWaste
(Imported from text file)
 
m (add picture and link)
Line 1: Line 1:
[[File:Allerton.png|320px|left|Amey Cespa Allerton]]
[[Category:EfW Plants]][[Category:Tonnage & Waste Types]][[Category:Technologies & Solutions]]
[[Category:EfW Plants]][[Category:Tonnage & Waste Types]][[Category:Technologies & Solutions]]
{{EfWTemplate|EPR=NP3034CG|id=16}}
{{EfWTemplate|EPR=NP3034CG|id=16}}

Revision as of 07:44, 7 February 2020

Amey Cespa Allerton
Amey Cespa Allerton


Allerton Waste Recovery Park (EfW)
Operational
Site Location
Site Location

See Residual EfW → page for a larger UK Wide map.

Waste Licence NP3034CG
Operator Thalia Waste Management
Region Yorkshire and the Humber
Operational Capacity 320ktpa
Is site R1? Yes
When was R1 Granted? 2019-03-26
What was the R1 value 0.75
Electrical Capacity 27.30MWe
Number of Lines 2
Number of Turbines 1
CHP No
Technology Approach EfW Incineration
Funding Type PPP

Operators Annual Report


Input Data

Year HH C&I Clin RDF Total
2016 0.00 0.00 0.00 0.00 0.00
2017 0.00 0.00 0.00 0.00 0.00
2018 222733.00 0.00 0.00 6693.00 243521.00
2019 256001.00 0.00 0.00 0.00 256001.00
2020 0.00 0.00 0.00 0.00 0.00
2021 287485.00 0.00 0.00 0.00 294009.00
2022 271746.00 7882.00 0.00 0.00 286293.00


Output Data

Year IBA IBA %ge of Tot IN APC APC %ge of Tot IN
2016 0.00 0.00% 0.00 0.00%
2017 0.00 0.00% 0.00 0.00%
2018 55464.84 22.78% 8274.35 3.40%
2019 54423.00 21.26% 9105.00 3.56%
2020 0.00 0.00% 0.00 0.00%
2021 61695.00 20.98% 10208.00 3.47%
2022 60655.00 21.19% 9397.00 3.28%

Summary

History

Plant

Local Authority Users

References