R1 Recovery Facility

From WikiWaste
(Redirected from R1)

An Energy from Waste (EfW) facility that qualifies for R1 status is considered an Energy Recovery Facility rather than as a disposal facility.

Recovery Facility Definition Applied to Energy from Waste

Article 3 of the Waste Framework Directive (WFD) 2008/98/EC defines 'Recovery' as: 'any operation the principal result of which is waste serving a useful purpose by replacing other materials which would otherwise have been used to fulfill a particular function, or waste being prepared to fulfill that function, in the plant or in the wider economy'. Annex II (of the WFD) sets out a non-exhaustive list of recovery operations.The R1 status of an Energy from Waste (EfW) facility classifies it as an Energy Recovery Facility rather than as a disposal operation such as a D10 operation - incineration on Land. 'Disposal' on the otherhand is defined as: 'any operation which is not recovery even where the operation has as a secondary consequence the reclamation of substances or energy'. Annex I (of the WFD) sets out a non-exhaustive list of disposal operations.

The EU standard sets a requirement to exceed a certain level of power conversion efficiency to qualify it as an R1 facility.

Qualifying for R1 Status

For a MSW EfW facility to qualify for R1 status it must:

Only R1 facilities can receive WDF from other EU countries for processing – export to other EU countries for Disposal (for example to an Incinerator that does not have R1 status) is illegal[2].

The formula for calculating the R1 status of a MSW EfW facility is given below:

[math]\displaystyle{ Pl_{ef} = {{O_{exp}-(E_f+E_{imp})} \over {(E_f+E_{imp}+E_{circ})}} }[/math]

all figures as equivalents in accordance to BREF,Chapter 3.5.6

  • Plef = Plant Efficiency.
  • Ef = annual energy input to the system by fuels with steam production (GJ/y)
  • Eimp = annual imported energy (Note: energy from the treated waste (Ew) is not included)
  • Ecirc = annual energy circulated
  • Oexp = annual exported energy (combined total of heat plus electricity as equivalents)

Energy Efficiency Results[1]

The minimum R1 values are:

0.60 for MSW permitted and in operation before 1 January 2009

0.65 for MSW permitted and in operation after 31 December 2008

Table of R1 Facilities

DEFRA last updated their list of facilities with granted R1 status for England in December 2020[3]. These sites are listed below, and link to the relevant site-based page in WikiWaste, where applicable:

EfW Plant Name Operational Status R1 Evaluation Type R1 Value
Runcorn EfW Operational Operational 0.94
Heysham EfW Plant Planning Design 0.88
Beddington EfW Operational Operational 0.88
Riverside Energy Park (REP) Under Construction Design 0.87
Severnside Energy Recovery Centre Operational Operational 0.86
Ardley EfW Operational Design 0.84
Great Blakenham EfW Operational Operational 0.83
Wilton 11 EfW Operational Operational 0.83
Kemsley K3 EfW Operational Operational 0.82
Ferrybridge Multifuel 2 (FM2) Operational Operational 0.82
Peterborough EfW Operational Operational 0.80
North Yard EfW (Devonport EfW CHP Facility) Operational Operational 0.80
Ferrybridge Multifuel 1 (FM1) Operational Design 0.80
Edmonton EcoPark EfW Operational Design 0.80
Rookery Pit Energy Recovery Facility (Rookery South) Operational Operational 0.80
Severn Road Resource Recovery Centre Operational Operational 0.79
Javelin Park EfW Operational Operational 0.79
Corby Energy Recovery Centre Planning Design 0.78
Sheffield ERF Operational Operational 0.77
Leeds Recycling & ERF (Cross Green ERF) Operational Design 0.77
Riverside Resource Recovery Facility (RRRF) Operational Operational 0.76
East Midlands Energy Re-Generation Centre (EMERGE) Planning 0.76
Greatmoor EfW Operational Design 0.76
Cornwall ERC Operational Operational 0.76
EnviRecover - Hartlebury EFW Operational Operational 0.75
Allerton Waste Recovery Park (EfW) Operational Operational 0.75
Belfast Harbour Estate Operational Design 0.74
Dunbar EfW (Oxwellmains EfW) Operational Operational 0.74
Four Ashes EfW (Staffordshire ERF) (W2R) Operational Design 0.73
North East Energy Recovery Centre. Lines 4 & 5 Operational Operational 0.70
Bilsthorpe Energy Centre Planning Design 0.68
Lakeside EfW Operational Operational 0.68
Teeside EfW - lines 1-5 (Teeside & NEERC), Billingham. line 3 Operational Operational 0.68
Lincolnshire EFW Operational Operational 0.68
North Quay ERF (Newhaven) Operational Operational 0.68
Battlefield EfW Operational Operational 0.67
Parc Adfer EfW Operational Operational 0.67
Marchwood ERF (Integra South West) Operational Operational 0.67
North East Energy Recovery Centre. Lines 1&2 Operational Operational 0.66
Portsmouth ERF (Integra South East) Operational Operational 0.66
Vine Street EfW (Kirkless EfW) Operational Operational 0.66
Tyseley ERF Operational Operational 0.62
SELCHP ERF Operational Operational 0.60
Allington EFW Operational Operational 0.54

References

  1. 1.0 1.1 Waste incinerator plant: apply for R1 status. GOV.UK. 2019.[online] [Accessed 31 Oct. 2019].
  2. European Commission, 2008. Guidelines on the Interpretation of the R1 Energy Efficiency Formula for Incineration Facilities Dedicated to the Processing of Municipal Solid waste According to Annex II of Directive 2008/98/EC on Waste. Directorate-General Environment.
  3. https://data.gov.uk/dataset/8287c81b-2288-4f14-9068-52bfda396402/r1-status-of-incinerators-in-england