Portsmouth ERF (Integra South East)

From WikiWaste

An EfW facility based upon conventional combustion technology and considered an ERF based on its R1 status. Portsmouth ERF, also known as Integra South East, is located on an industrial site in the city of Portsmouth, Hampshire, making it the only inner-city EfW facility in the county. The facility has a permitted operational capacity of 210,000 tonnes per annum, exporting up to 14 MW electricity to the national grid after the plants own power needs are supplied for[1].


Portsmouth ERF (Integra South East)
Operational
Site Location
Site Location

See Residual EfW → page for a larger UK Wide map.

Waste Licence BJ7107IJ
Operator Veolia
Region South East
Operational Capacity 220ktpa
Is site R1? Yes
When was R1 Granted? 2015-10-07
What was the R1 value 0.66
Electrical Capacity 14.00MWe
Number of Lines 2
Number of Turbines 1
CHP No
Technology Approach EfW Incineration
Funding Type PPP

Operators Annual Report


Input Data

Year HH C&I Clin RDF Total
2016 0.00 0.00 0.00 0.00 0.00
2017 0.00 0.00 0.00 0.00 0.00
2018 177099.00 30369.00 0.00 0.00 207468.00
2019 168207.00 26369.00 0.00 0.00 194576.00
2020 180497.00 19713.00 7019.00 0.00 207229.00
2021 167299.00 26385.00 7580.00 0.00 201264.00
2022 163081.00 35014.00 4619.00 0.00 202714.00


Output Data

Year IBA IBA %ge of Tot IN APC APC %ge of Tot IN
2016 38010.00 0.00% 5187.00 0.00%
2017 37007.00 0.00% 5227.00 0.00%
2018 37667.00 18.16% 5119.00 2.47%
2019 34213.00 17.58% 4865.00 2.50%
2020 36769.00 17.74% 4853.00 2.34%
2021 34704.00 17.24% 4817.00 2.39%
2022 36862.00 18.18% 4520.00 2.23%

Portsmouth ERF. Veolia, 2020.
Portsmouth ERF. Veolia, 2020.


Summary

An EfW facility based upon conventional combustion technology and considered an ERF based on its R1 status. Portsmouth ERF, also known as Integra South East, is located on an industrial site in the city of Portsmouth, Hampshire, making it the only inner-city EfW facility in the county. The facility has a permitted operational capacity of 210,000 tonnes per annum, exporting up to 14 MW electricity to the national grid after the plants own power needs are supplied for[1].

The plant is owned and operated by Veolia. The waste feedstock utilised at the plant is primarily residual waste arising from households and businesses located in Portsmouth City and the South East Hampshire Districts[1].

History

This facility has been developed and continues to be managed under the 28-year Public Private Partnership contract with Hampshire County Council, Southampton City Council and Portsmouth City Council[1].

Portsmouth ERF completed construction and commissioning, and became operational in spring 2005, following this, in 2006 the Portsmouth ERF was presented with a Design Award by the Portsmouth Civic Society. The ERF has also gained the prestigious Edmund Hambly Medal award from the Institute of Civil Engineering for creative design in an engineering project that makes a substantial contribution to sustainable development[1].

Plant

The ERF is situated adjacent to the Portsmouth MRF[1].

Due to this EfW being located in an urban area, special consideration was given to its architectural design. This was given high priority throughout the development process, with a specialist architect designated to the project who developed a design of high architectural merit[2].

The combustion technology is the Martin GmbH reverse acting grate with a two lines[3]. The EPC contractor to build the plant was CNIM, who also supplied the semi-dry lime scrubber for treatment of the flue gas which is followed by high performance bag filters, discharging into a 65 metre high chimney[2].

Project Integra is a unique partnership between Hampshire County Council, the two Unitary Authorities of Southampton and Portsmouth, the 11 District Councils and Veolia Environmental Services.

Local Authority Data

The table below lists those local authorities who have recorded their tonnage on WasteDataFlow as sending their Waste to this site (either directly or via a transfer station) for the most recent financial year, data was updated on 2023-04-26. The tonnage received cannot be directly compared with the stated historical tonnage received and recorded in the EA statistics as these are recorded on a calendar year basis (i.e. January 2018 to December 2018). The total Local Authority waste received by the plant in the period was: 127,919.17t

A 'zero return' or a below expected return, when compared to the EA Data below indicates that either:

  • no local authority tonnage was recorded/no tonnage was sent to the site in the period (but has been listed as it may have previously received tonnage from a local authority) or
  • a result of the plant being recently commissioned and actually having received no tonnage or
  • a lower than expected tonnage maybe a result of a local authority splitting their tonnage over multiple sites, having less tonnage to send than might be anticipated or
  • it may be a new plant being in 'ramp up' towards full capacity after construction or
  • may be a result of plant shut down and subsequent re-start in a year or
  • the local authority may not have correctly entered the site's details on WasteDataFlow


Authority Tonnage
Hampshire County Council 127919.170

Waste Tonnage, By Origin

The table shows a list of the Waste for the Permit BJ7107IJ, that has arrived into sites as reported to the Regulator and then publicised in their reported statistics. The Data was last updated on October 2023. The total reported tonnage arriving at the site was: 202,714.28t. Where this tonnage exceeds that reported in year of the corresponding annual report, this may be due to the following reasons:

  • Tonnage may have been received but not incinerated, i.e. the material is held pending incineration (the operator return to the EA reports as received whereas the annual report focuses on when the waste is incinerated.)
  • Material may have been received into the site but treated in some other way than incineration.
  • Material may have been received on the but transferred out of site for disposal/treatment at another site rather than incineration on the site.
EWC Code Origin of Waste Tonnes In
20 01 99 Fareham 4.08
20 03 03 Portsmouth 2002.11
19 12 12 Portsmouth 12.42
20 03 01 Rushmoor 22.14
20 01 08 Outside UK 0.54
18 01 04 West Sussex 3353.53
20 03 01 Brighton and Hove 374.38
20 03 01 Eastleigh 319.25
20 03 03 Hampshire 151.65
20 03 03 Gosport 577.10
20 03 01 Havant 20228.16
20 01 01 East Hampshire 8.20
20 03 01 New Forest 223.28
20 03 01 East Hampshire 10348.15
20 03 01 Southampton 5091.48
18 01 04 Fareham 815.78
19 12 10 Fareham 2067.76
20 03 01 Hampshire 37111.69
20 01 08 Portsmouth 399.34
18 01 04 Portsmouth 0.96
20 03 03 Havant 439.60
20 01 99 Hampshire 359.28
20 03 01 Gosport 16661.40
20 03 01 Winchester 3639.13
20 03 01 Fareham 26052.52
20 03 01 Portsmouth 70773.07
18 01 04 East Hampshire 254.34
19 12 12 Hampshire 1422.94


References