Allerton Waste Recovery Park (EfW): Difference between revisions

From WikiWaste
m (Update links)
m (minor typo)
Line 4: Line 4:


==Summary==
==Summary==
An [[EfW]] facility based upon conventional combustion technology and considered an [[ERF]] based on its [[R1]] status. The Allerton site has permitted operational capacity of 320,000 tonnes per annum, and is operated by [[AmeyCespa]]. Delivery of waste is by road and the facility processes primarily residual [[Household Waste]] and some [[Commercial Waste]]<ref>{https://wasteservices.amey.co.uk/where-we-work/north-yorkshire/ Amey Website]</ref>.  
An [[EfW]] facility based upon conventional combustion technology and considered an [[ERF]] based on its [[R1]] status. The Allerton site has permitted operational capacity of 320,000 tonnes per annum, and is operated by [[AmeyCespa]]. Delivery of waste is by road and the facility processes primarily residual [[Household Waste]] and some [[Commercial Waste]]<ref>[https://wasteservices.amey.co.uk/where-we-work/north-yorkshire/ Amey Website]</ref>.  


==History==
==History==

Revision as of 05:32, 11 February 2020

Amey Cespa Allerton
Amey Cespa Allerton


Allerton Waste Recovery Park (EfW)
Operational
Site Location
Site Location

See Residual EfW → page for a larger UK Wide map.

Waste Licence NP3034CG
Operator Thalia Waste Management
Region Yorkshire and the Humber
Operational Capacity 320ktpa
Is site R1? Yes
When was R1 Granted? 2019-03-26
What was the R1 value 0.75
Electrical Capacity 27.30MWe
Number of Lines 2
Number of Turbines 1
CHP No
Technology Approach EfW Incineration
Funding Type PPP

Operators Annual Report


Input Data

Year HH C&I Clin RDF Total
2016 0.00 0.00 0.00 0.00 0.00
2017 0.00 0.00 0.00 0.00 0.00
2018 222733.00 0.00 0.00 6693.00 243521.00
2019 256001.00 0.00 0.00 0.00 256001.00
2020 0.00 0.00 0.00 0.00 0.00
2021 287485.00 0.00 0.00 0.00 294009.00
2022 271746.00 7882.00 0.00 0.00 286293.00


Output Data

Year IBA IBA %ge of Tot IN APC APC %ge of Tot IN
2016 0.00 0.00% 0.00 0.00%
2017 0.00 0.00% 0.00 0.00%
2018 55464.84 22.78% 8274.35 3.40%
2019 54423.00 21.26% 9105.00 3.56%
2020 0.00 0.00% 0.00 0.00%
2021 61695.00 20.98% 10208.00 3.47%
2022 60655.00 21.19% 9397.00 3.28%

Summary

An EfW facility based upon conventional combustion technology and considered an ERF based on its R1 status. The Allerton site has permitted operational capacity of 320,000 tonnes per annum, and is operated by AmeyCespa. Delivery of waste is by road and the facility processes primarily residual Household Waste and some Commercial Waste[1].

History

The Allerton facility was built primarily to service a 25 year PPP contract signed in 2010 between and North Yorkshire County Council and York City Council, for 230,000 tones per annum of the anticipated total throughput of up to 320,000 tonnes per annum. The plant has an integrated Mechanical Biological Treatment process with mechanical sorting of organics for subsequent processing in Anaerobic Digestion and then EfW of the RDF material produced[2].

Plant

Built by Vinci Environment UK (a 50/50 subsidiary of Vinci Construction UK and Vinci Environment) under a Design & Build-turnkey contract, construction started in early 2015 and was completed in March 2018 at a reported[3] GBP £183m capital cost. The plant comprises 2 lines of 20 tonnes/hour with a design capacity capable of treating 330,000 tonnes per annum via standard combustion technology, air cooled, Vinci Grate, generating super-heated steam, and is configured to run on residual Household Waste and Commercial Waste delivering 25 MWe of power[4].

Local Authority Users

References