Belfast Harbour Estate

From WikiWaste
Revision as of 12:49, 18 February 2020 by Bin52 (talk | contribs) (add page specific text)
Artist Impression of Belfast EFW
Artist Impression of Belfast EFW


Error: no local variable "site" has been set.
Error: no local variable "status" has been set.
Site Location
Site Location

See Residual EfW → page for a larger UK Wide map.

Waste Licence Error: no local variable "epr" has been set.
Operator [[Error: no local variable "operator" has been set.]]
Region [[:Category:Error: no local variable "region" has been set.|Error: no local variable "region" has been set.]]
Operational Capacity Error: no local variable "cap" has been set.ktpa
Is site R1? Error: no local variable "r1" has been set.
When was R1 Granted? Error: no local variable "r1date" has been set.
What was the R1 value Error: no local variable "r1value" has been set.
Electrical Capacity Error: no local variable "mwe" has been set.MWe
Number of Lines Error: no local variable "line" has been set.
Number of Turbines Error: no local variable "turbine" has been set.
CHP Error: no local variable "chp" has been set.
Technology Approach Error: no local variable "techtype" has been set.
Funding Type [[Error: no local variable "funding" has been set.]]

Operators Annual Report


Input Data

Year HH C&I Clin RDF Total


Output Data

Year IBA IBA %ge of Tot IN APC APC %ge of Tot IN

Summary

An EfW facility based upon Gasification technology. The Belfast Harbour site, also known as the Bombardier site due to its proximity to this business, is being delivered by a joint venture known as Full Circle Generation (including River Ridge Energy Ltd, Green Investment Bank, Equitix, and P3P Partners). The plant is listed as being able to process 120,000 tonnes per year, but is also reported as being capable of processing 180,000 tonnes per year[1].

Technology

The plant is a 3 line, grate based technology by Biomass Power Limited, generating steam to turbines delivering 14.85MWe[2].

Construction

The plant is being constructed under a turnkey EPC arrangement at a capital cost of GBP £107m by Bouygues Energy Services who will also operate and maintain the plant for 17 years[3].

Waste Input

The plant is designed to run on 120,000 tonnes per year of prepared RDF from offsite company Pioneer Fuels.

References