==Summary==
==Summary==
An [[EfW]] facility based upon conventional [[combustion]] technology that was granted [[Planning Permission|planning permission]] in December 2020 and has a permitted capacity of 84,900 tonnes per annum. This consent replaced an earlier consent for a [[gasification]] technology with a capacity of 60,000 tonnes per annum.  
An [[EfW]] facility based upon conventional [[combustion]] technology that was granted [[Planning Permission|planning permission]] in December 2020 and has a permitted capacity of 84,900 tonnes per annum. This consent replaced an earlier consent for a [[gasification]] technology with a capacity of 60,000 tonnes per annum. Construction was reported to have commenced in May 2024 with planned operation by early 2026<ref>[https://www.letsrecycle.com/news/construction-begins-on-paprec-energies-binns-efw-plant/ Letsrecycle article 8th May 2024]</ref>.


The site is part of the wider activity at [[Binn Eco Park]], near Perth, Scotland, owned by the [[Binn Group]], and investment has been agreed for the facility with [[Iona Capital]]<ref>[https://www.ionacapital.co.uk/single-post/iona-capital-to-invest-in-binn-group-s-energy-from-waste-project-in-scotland Iona Capital Website News Accessed March 2020]</ref>.
The site is part of the wider activity at [[Binn Eco Park]], near Perth, Scotland, owned by the [[Binn Group]], funded by [[Paprec]] for 120m euros<ref>[https://www.paprec.com/en/press-area/?_gl=1*ss6n60*_up*MQ..*_ga*MTk3MDkxMDYxOC4xNzE1MTY1OTg0*_ga_SGCZ67G3GG*MTcxNTE2NTk4NC4xLjEuMTcxNTE2NjAxMS4wLjAuNDU2ODk3OA.. Paprec News October 2023]</ref> it will be built and operated by [[Paprec Energies Binn]] a joint venture between [[Paprec]] and the [[Binn Group]].


==Technology==
==Technology==
The plant technology will comprise standard moving [[grate]] technology, with an operational capacity of 89,00 tonnes per annum, generating 8.6MWe with 7.3MWe net for export.  
The plant technology will comprise standard moving [[grate]] technology by [[Martin]]<ref>[https://www.paprec.com/en/green-energy-martin-gmbh-and-paprec-energies-a-winning-combination/?_gl=1*1vorw05*_up*MQ..*_ga*MTk3MDkxMDYxOC4xNzE1MTY1OTg0*_ga_SGCZ67G3GG*MTcxNTE2NTk4NC4xLjEuMTcxNTE2NTk5NS4wLjAuNDU2ODk3OA.. Paprec News item ]</ref>, with an operational capacity of 89,000 tonnes per annum, generating 8.6MWe with 7.3MWe net for export.  


==Construction==
==Construction==
The plant gained [[Planning Permission|planning permission]] in December 2020. Construction was originally reported to commence in 2021 with operational handover in 2024. Earlier reports were the project would cost £70 million to deliver<ref>https://resource.co/article/binn-group-revises-plans-70m-efw-facility</ref>. A press release in March 2022 announced the appointment of [[TIRU]] as the construction contractor and operator of the plant with an aspiration to still deliver the plant by 2024<ref>[https://binngroup.co.uk/2022/03/04/developer-and-operator-appointed-for-perthshire-efw/ Binn Group Website accessed 7th March 2022]</ref>.
The plant gained [[Planning Permission|planning permission]] in December 2020. Construction was reported to have commenced in may 2024 for operation by early 2026<ref>[https://www.letsrecycle.com/news/construction-begins-on-paprec-energies-binns-efw-plant/ Letsrecycle article 8th May 2024]</ref>.


==Waste Input==
==Waste Input==

Latest revision as of 05:08, 8 May 2024


An EfW facility based upon conventional combustion technology that was granted planning permission in December 2020 and has a permitted capacity of 84,900 tonnes per annum. This consent replaced an earlier consent for a gasification technology with a capacity of 60,000 tonnes per annum.


Binn Eco Park EFW
Planning
Site Location
Site Location

See Residual EfW → page for a larger UK Wide map.

Waste Licence Tbc09
Operator Binn Group
Region Scotland
Operational Capacity 85ktpa
Is site R1? No
When was R1 Granted?
What was the R1 value 0.00
Electrical Capacity 7.30MWe
Number of Lines 0
Number of Turbines 0
CHP No
Technology Approach EfW Incineration
Funding Type [[]]

Operators Annual Report


Input Data

Year HH C&I Clin RDF Total


Output Data

Year IBA IBA %ge of Tot IN APC APC %ge of Tot IN

Rendered image of Binn Eco Park EFW from Iona Captial website, all rights reserved
Rendered image of Binn Eco Park EFW from Iona Captial website, all rights reserved


Summary

An EfW facility based upon conventional combustion technology that was granted planning permission in December 2020 and has a permitted capacity of 84,900 tonnes per annum. This consent replaced an earlier consent for a gasification technology with a capacity of 60,000 tonnes per annum. Construction was reported to have commenced in May 2024 with planned operation by early 2026[1].

The site is part of the wider activity at Binn Eco Park, near Perth, Scotland, owned by the Binn Group, funded by Paprec for 120m euros[2] it will be built and operated by Paprec Energies Binn a joint venture between Paprec and the Binn Group.

Technology

The plant technology will comprise standard moving grate technology by Martin[3], with an operational capacity of 89,000 tonnes per annum, generating 8.6MWe with 7.3MWe net for export.

Construction

The plant gained planning permission in December 2020. Construction was reported to have commenced in may 2024 for operation by early 2026[4].

Waste Input

The plant is intended to run on residual Household Waste and Commercial Waste from the adjacent processing facilities on the site.

References