Bulwell Energy: Difference between revisions

From WikiWaste
No edit summary
(add page specific text)
Line 3: Line 3:


==Summary==
==Summary==
An [[EfW]] facility based upon [[Gasification]] technology. [[Bulwell Energy Ltd]] is a subsidiary of [[Chinook]] and the site is geographically close to the demonstration plant they have in Nottingham. Whilst an Environmental Permit was issued in late 2018 <ref>[https://assets.publishing.service.gov.uk/government/uploads/system/uploads/attachment_data/file/749091/Partial_Surrender_Notice.pdf Gov.uk Website]</ref> no construction is understood to have commenced.


==History==
==Technology==
The plant was based on [[Chinook]]'s [[RODECS]] [[Gasification]] technology.


==Plant==
==Construction==
There is no information on the current status of funding or construction of the project in the public domain, with the most recent project news only discussing the commercialisation of the demonstration plant to produce activated carbon in March 2019<ref>[http://www.chinooksciences.com/news/#.XkwlK9hzzIU Chinook Website]</ref>


==Local Authority Users==
==Waste Input==
The overall facility was designed to run on 160,000 tonnes per annum of [[RDF]].


==References==
==References==
<references />
<references />

Revision as of 12:00, 18 February 2020


Error: no local variable "site" has been set.
Error: no local variable "status" has been set.
Site Location
Site Location

See Residual EfW → page for a larger UK Wide map.

Waste Licence Error: no local variable "epr" has been set.
Operator [[Error: no local variable "operator" has been set.]]
Region [[:Category:Error: no local variable "region" has been set.|Error: no local variable "region" has been set.]]
Operational Capacity Error: no local variable "cap" has been set.ktpa
Is site R1? Error: no local variable "r1" has been set.
When was R1 Granted? Error: no local variable "r1date" has been set.
What was the R1 value Error: no local variable "r1value" has been set.
Electrical Capacity Error: no local variable "mwe" has been set.MWe
Number of Lines Error: no local variable "line" has been set.
Number of Turbines Error: no local variable "turbine" has been set.
CHP Error: no local variable "chp" has been set.
Technology Approach Error: no local variable "techtype" has been set.
Funding Type [[Error: no local variable "funding" has been set.]]

Operators Annual Report


Input Data

Year HH C&I Clin RDF Total


Output Data

Year IBA IBA %ge of Tot IN APC APC %ge of Tot IN

Summary

An EfW facility based upon Gasification technology. Bulwell Energy Ltd is a subsidiary of Chinook and the site is geographically close to the demonstration plant they have in Nottingham. Whilst an Environmental Permit was issued in late 2018 [1] no construction is understood to have commenced.

Technology

The plant was based on Chinook's RODECS Gasification technology.

Construction

There is no information on the current status of funding or construction of the project in the public domain, with the most recent project news only discussing the commercialisation of the demonstration plant to produce activated carbon in March 2019[2]

Waste Input

The overall facility was designed to run on 160,000 tonnes per annum of RDF.

References