Coventry EfW Plant: Difference between revisions

From WikiWaste
No edit summary
(Update to new format)
Line 1: Line 1:
[[File:Coventry.png|250px|left|CSWDC Coventry]]
{#vardefine:epr|NP3739PD}}
 
[[Category:EfW Plants]]
[[Category:EfW Plants]]
{{EfWTemplate|EPR=NP3739PD|id=17}}


An [[EfW]] facility based upon conventional combustion technology which is not considered an [[ERF]] as a result of not having [[R1]] status. Coventry has permitted operational capacity of 315,000 tonnes per annum, operated and owned by [[Coventry and Solihull Waste Disposal Company]] ([[CSWDC]]) whose shareholders are [[Coventry City Council]], [[Solihull Metropolitan Borough Council]] and [[Warwickshire County Council]]. Delivery of waste is by road and the facility processes primarily residual [[Household Waste]].
{{EfWTemplate|EPR={{#var:epr}}|id=17}}
[[File:Coventry.png|250px|left|CSWDC Coventry]]__TOC__
<br clear='left' />
==Summary==
==Summary==
An [[EfW]] facility based upon conventional combustion technology which is not considered an [[ERF]] as a result of not having [[R1]] status. Coventry has permitted operational capacity of 315,000 tonnes per annum, operated and owned by [[Coventry and Solihull Waste Disposal Company]] ([[CSWDC]]) whose shareholders are [[Coventry City Council]], [[Solihull Metropolitan Borough Council]] and [[Warwickshire County Council]]. Delivery of waste is by road and the facility processes primarily residual [[Household Waste]].
An [[EfW]] facility based upon conventional combustion technology which is not considered an [[ERF]] as a result of not having [[R1]] status. Coventry has permitted operational capacity of 315,000 tonnes per annum, operated and owned by [[Coventry and Solihull Waste Disposal Company]] ([[CSWDC]]) whose shareholders are [[Coventry City Council]], [[Solihull Metropolitan Borough Council]] and [[Warwickshire County Council]]. Delivery of waste is by road and the facility processes primarily residual [[Household Waste]].
Line 13: Line 17:


==Local Authority Users==
==Local Authority Users==
The following  represents those local authorities recorded as putting tonnage into the site (either directly or via a transfer station). The tonnage received cannot be directly compared with the stated historical tonnage received and recorded in the [[EA]] statistics as these are recorded on a calendar year basis (i.e. January 2018 to December 2018). A 'zero return' below indicates no local authority tonnage was recorded, most likely a result of the plant being recently commissioned and actually having received no tonnage. Equally, lower than expected tonnage maybe a result of either a new plant being in 'ramp up' towards full capacity after construction, or may be a result of plant shut down and subsequent re-start in a year.
{{EfWLAData|EPR={{#var: epr}}}}
{{#clear_external_data:}}
{{#get_db_data: db=engy
|from=wdfincin|where=epr='NP3739PD'|data=authority=authority,epr=epr,ton=ton}}
{|class="wikitable sortable"
! Authority
! Tonnage {{#for_external_table:<nowiki/>
{{!}}-
{{!}} [[{{{authority}}}]]
{{!}} {{{ton}}}
}}
|}
 
==References==
==References==
<references />
<references />

Revision as of 04:30, 22 April 2021

{#vardefine:epr|NP3739PD}}

An EfW facility based upon conventional combustion technology which is not considered an ERF as a result of not having R1 status. Coventry has permitted operational capacity of 315,000 tonnes per annum, operated and owned by Coventry and Solihull Waste Disposal Company (CSWDC) whose shareholders are Coventry City Council, Solihull Metropolitan Borough Council and Warwickshire County Council. Delivery of waste is by road and the facility processes primarily residual Household Waste.


Houghton Main
Planning
Site Location
Site Location

See Residual EfW → page for a larger UK Wide map.

Waste Licence
Operator Cogen (Peel Environmental)
Region Yorkshire and the Humber
Operational Capacity 260ktpa
Is site R1? No
When was R1 Granted?
What was the R1 value 0.00
Electrical Capacity 22.00MWe
Number of Lines 0
Number of Turbines 0
CHP Yes
Technology Approach EfW Incineration
Funding Type [[]]

Operators Annual Report


Input Data

Year HH C&I Clin RDF Total
2016 0.00 0.00 0.00 0.00 0.00
2016 0.00 0.00 0.00 0.00 0.00
2016 0.00 0.00 0.00 0.00 0.00
2016 0.00 0.00 0.00 0.00 0.00
2016 0.00 0.00 0.00 0.00 0.00
2016 0.00 0.00 0.00 0.00 0.00
2016 0.00 0.00 0.00 0.00 0.00
2016 0.00 0.00 0.00 0.00 0.00
2017 0.00 0.00 0.00 0.00 0.00
2017 0.00 0.00 0.00 0.00 0.00
2017 0.00 0.00 0.00 0.00 0.00
2017 0.00 0.00 0.00 0.00 0.00
2017 0.00 0.00 0.00 0.00 0.00
2017 0.00 0.00 0.00 0.00 0.00
2017 0.00 0.00 0.00 0.00 0.00
2018 0.00 0.00 0.00 0.00 0.00
2018 0.00 0.00 0.00 0.00 0.00
2018 0.00 0.00 0.00 0.00 0.00
2018 0.00 0.00 0.00 0.00 0.00
2018 0.00 0.00 0.00 0.00 0.00
2018 0.00 0.00 0.00 0.00 0.00
2018 0.00 0.00 0.00 0.00 0.00
2019 0.00 0.00 0.00 0.00 0.00
2019 0.00 0.00 0.00 0.00 0.00
2019 0.00 0.00 0.00 0.00 0.00
2019 0.00 0.00 0.00 0.00 0.00
2019 0.00 0.00 0.00 0.00 0.00
2019 0.00 0.00 0.00 0.00 0.00


Output Data

Year IBA IBA %ge of Tot IN APC APC %ge of Tot IN
2016 0.00 0.00% 0.00 0.00%
2016 0.00 0.00% 0.00 0.00%
2016 0.00 0.00% 0.00 0.00%
2016 0.00 0.00% 0.00 0.00%
2016 0.00 0.00% 0.00 0.00%
2016 0.00 0.00% 0.00 0.00%
2016 0.00 0.00% 0.00 0.00%
2016 0.00 0.00% 0.00 0.00%
2017 0.00 0.00% 0.00 0.00%
2017 0.00 0.00% 0.00 0.00%
2017 0.00 0.00% 0.00 0.00%
2017 0.00 0.00% 0.00 0.00%
2017 0.00 0.00% 0.00 0.00%
2017 0.00 0.00% 0.00 0.00%
2017 0.00 0.00% 0.00 0.00%
2018 0.00 0.00% 0.00 0.00%
2018 0.00 0.00% 0.00 0.00%
2018 0.00 0.00% 0.00 0.00%
2018 0.00 0.00% 0.00 0.00%
2018 0.00 0.00% 0.00 0.00%
2018 0.00 0.00% 0.00 0.00%
2018 0.00 0.00% 0.00 0.00%
2019 0.00 0.00% 0.00 0.00%
2019 0.00 0.00% 0.00 0.00%
2019 0.00 0.00% 0.00 0.00%
2019 0.00 0.00% 0.00 0.00%
2019 0.00 0.00% 0.00 0.00%
2019 0.00 0.00% 0.00 0.00%

CSWDC Coventry
CSWDC Coventry


Summary

An EfW facility based upon conventional combustion technology which is not considered an ERF as a result of not having R1 status. Coventry has permitted operational capacity of 315,000 tonnes per annum, operated and owned by Coventry and Solihull Waste Disposal Company (CSWDC) whose shareholders are Coventry City Council, Solihull Metropolitan Borough Council and Warwickshire County Council. Delivery of waste is by road and the facility processes primarily residual Household Waste.

History

The Coventry facility was built to primarily service residual Household Waste from Coventry City Council under a long term PPP which lists tonnage at 245,000 tonnes per annum. The plant was re-furbished in 2012/203 by Martin Biopower to create a design capacity of 315,000 tonnes per annum[1]

Plant

The plant comprises standard combustion over 3 lines, generating super-heated steam, and is configured to run on primarily residual Household Waste and similar residual Commercial Waste. The plant provides 12,000MWhth of heat to users in Coventry City Centre[2].

Local Authority Users

Local Authority Data

The table below lists those local authorities who have recorded their tonnage on WasteDataFlow as sending their Waste to this site (either directly or via a transfer station) for the most recent financial year, data was updated on Error: no local variable "updated" has been set.. The tonnage received cannot be directly compared with the stated historical tonnage received and recorded in the EA statistics as these are recorded on a calendar year basis (i.e. January 2018 to December 2018). The total Local Authority waste received by the plant in the period was: 0t

A 'zero return' or a below expected return, when compared to the EA Data below indicates that either:

  • no local authority tonnage was recorded/no tonnage was sent to the site in the period (but has been listed as it may have previously received tonnage from a local authority) or
  • a result of the plant being recently commissioned and actually having received no tonnage or
  • a lower than expected tonnage maybe a result of a local authority splitting their tonnage over multiple sites, having less tonnage to send than might be anticipated or
  • it may be a new plant being in 'ramp up' towards full capacity after construction or
  • may be a result of plant shut down and subsequent re-start in a year or
  • the local authority may not have correctly entered the site's details on WasteDataFlow


Authority Tonnage

References