Drakelow Renewable Energy Centre: Difference between revisions

From WikiWaste
(Created page with "Category:EfW Plants {{EfWTemplate|EPR=Tbc#29|id=95}}")
 
(add page specific text)
Line 1: Line 1:
[[File:Drakelow efw website.jpg.750x460 q85 crop.jpg|400px|left|Artist Image of Drakelow Plant: source Vital Energi Website]]
[[Category:EfW Plants]]
[[Category:EfW Plants]]
{{EfWTemplate|EPR=Tbc#29|id=95}}
{{EfWTemplate|EPR=Tbc#29|id=95}}
==Summary==
An [[EfW]] facility based upon [[Gasification]] technology. The Drakelow site is near Burton Upon Trent on an old demolished coal-fired power station site owned by [[EON]], was originally developed by [[Future Earth Energy]], but reached financial close with Vital Energi in February 2020. Vital Energi will also take the project forwards and act as the operator when built<ref>[https://www.vitalenergi.co.uk/blog/vital-energi-invests-in-energy-from-waste-facility-set-to-add-18mwe-of-green-energy-to-the-grid/ Vital Energi Website]</ref>.
==Technology==
The plant is understood to be a 3 line, grate based technology by [[Biomass Power Limited]], generating steam to turbines delivering 18MWe gross (15MWe net) and will be CHP enabled.
==Construction==
The plant is yet to commence construction at the time of this page entry, but is due to be operational in 2023 <ref>[https://www.letsrecycle.com/news/latest-news/vital-energi-efw/ Letsrecycle Article]</ref>.
==Waste Input==
The plant is listed to run on 169,000 tonnes per year of prepared [[RDF]] from offsite company [[Beauparc]] under an exclusive [[Fuel Supply Agreement]].
==References==
<references />

Revision as of 02:21, 24 April 2020

Artist Image of Drakelow Plant: source Vital Energi Website
Artist Image of Drakelow Plant: source Vital Energi Website


Error: no local variable "site" has been set.
Error: no local variable "status" has been set.
Site Location
Site Location

See Residual EfW → page for a larger UK Wide map.

Waste Licence Error: no local variable "epr" has been set.
Operator [[Error: no local variable "operator" has been set.]]
Region [[:Category:Error: no local variable "region" has been set.|Error: no local variable "region" has been set.]]
Operational Capacity Error: no local variable "cap" has been set.ktpa
Is site R1? Error: no local variable "r1" has been set.
When was R1 Granted? Error: no local variable "r1date" has been set.
What was the R1 value Error: no local variable "r1value" has been set.
Electrical Capacity Error: no local variable "mwe" has been set.MWe
Number of Lines Error: no local variable "line" has been set.
Number of Turbines Error: no local variable "turbine" has been set.
CHP Error: no local variable "chp" has been set.
Technology Approach Error: no local variable "techtype" has been set.
Funding Type [[Error: no local variable "funding" has been set.]]

Operators Annual Report


Input Data

Year HH C&I Clin RDF Total


Output Data

Year IBA IBA %ge of Tot IN APC APC %ge of Tot IN


Summary

An EfW facility based upon Gasification technology. The Drakelow site is near Burton Upon Trent on an old demolished coal-fired power station site owned by EON, was originally developed by Future Earth Energy, but reached financial close with Vital Energi in February 2020. Vital Energi will also take the project forwards and act as the operator when built[1].

Technology

The plant is understood to be a 3 line, grate based technology by Biomass Power Limited, generating steam to turbines delivering 18MWe gross (15MWe net) and will be CHP enabled.

Construction

The plant is yet to commence construction at the time of this page entry, but is due to be operational in 2023 [2].

Waste Input

The plant is listed to run on 169,000 tonnes per year of prepared RDF from offsite company Beauparc under an exclusive Fuel Supply Agreement.

References