An [[EfW]] facility based upon conventional [[combustion]] technology which is not considered an [[ERF]] as a result of not having [[R1]] status. Dudley has permitted operational capacity of 105,000 tonnes per annum.
{{EfWTemplate|EPR={{#var: epr}}|id=37}}
[[File:Dudley.png|300px|left|Dudley EFW]]__TOC__
<br clear='left'/>


==Summary==
==Summary==
An [[EfW]] facility based upon conventional combustion technology which is not considered an [[ERF]] as a result of not having [[R1]] status. Dudley has permitted operational capacity of 105,000 tonnes per annum, operated and owned by [[MES Environmental]], part of the [[CNIM]] Group. Delivery of waste is by road and the facility processes primarily residual [[Household Waste]] <ref>[https://www.mesenvironmental.co.uk/index.php/operations/dudley/ MSES Website]</ref>.
An [[EfW]] facility based upon conventional [[combustion]] technology which is not considered an [[ERF]] as a result of not having [[R1]] status. The facility is operated by [[MES Environmental]], now part of [[Paprec]], having agreed to buy out [[CNIM]] in March 2021<ref>[https://cnim.com/sites/default/files/media/Communiqu%C3%A9s%20financiers/2021-03-25-CNIM-Communiqu%C3%A9-EN.pdf CNIM Press Release]</ref>. Delivery of waste is by road and the facility processes primarily residual [[Household Waste]] <ref>[https://www.mesenvironmental.co.uk/index.php/operations/dudley/ MSES Website]</ref>.


==History==
==History==
Line 10: Line 13:


==Plant==
==Plant==
The plant comprises two lines via standard combustion CNIM boilers, generating super-heated steam, and is configured to run on primarily residual [[Household Waste]] and similar residual [[Commercial Waste]] with design capability of 6 tonnes per hour or up to 99,000 tonnes per annum and generating 7 MWe.
The plant comprises two lines via standard [[combustion]] [[CNIM]] boilers, generating super-heated steam, and is configured to run on primarily residual [[Household Waste]] and similar residual [[Commercial Waste]] with design capability of 6 tonnes per hour or up to 99,000 tonnes per annum and generating 7 MWe.


==Local Authority Users==
==Local Authority Users==
The following  represents those local authorities recorded as putting tonnage into the site (either directly or via a transfer station). The tonnage received cannot be directly compared with the stated historical tonnage received and recorded in the [[EA]] statistics as these are recorded on a calendar year basis (i.e. January 2018 to December 2018). A 'zero return' below indicates no local authority tonnage was recorded, most likely a result of the plant being recently commissioned and actually having received no tonnage. Equally, lower than expected tonnage maybe a result of either a new plant being in 'ramp up' towards full capacity after construction, or may be a result of plant shut down and subsequent re-start in a year.
{{EfWLAData|EPR={{#var: epr}}}}
{{#clear_external_data:}}
 
{{#get_db_data: db=engy
|from=wdfincin|where=epr='AP3435SD'|data=authority=authority,epr=epr,ton=ton}}
{|class="wikitable sortable"
! Authority
! Tonnage {{#for_external_table:<nowiki/>
{{!}}-
{{!}} [[{{{authority}}}]]
{{!}} {{{ton}}}
}}
|}
==References==
==References==
<references />
<references />

Revision as of 04:35, 14 April 2021

An EfW facility based upon conventional combustion technology which is not considered an ERF as a result of not having R1 status. Dudley has permitted operational capacity of 105,000 tonnes per annum.


Error: no local variable "site" has been set.
Error: no local variable "status" has been set.
Site Location
Site Location

See Residual EfW → page for a larger UK Wide map.

Waste Licence Error: no local variable "epr" has been set.
Operator [[Error: no local variable "operator" has been set.]]
Region [[:Category:Error: no local variable "region" has been set.|Error: no local variable "region" has been set.]]
Operational Capacity Error: no local variable "cap" has been set.ktpa
Is site R1? Error: no local variable "r1" has been set.
When was R1 Granted? Error: no local variable "r1date" has been set.
What was the R1 value Error: no local variable "r1value" has been set.
Electrical Capacity Error: no local variable "mwe" has been set.MWe
Number of Lines Error: no local variable "line" has been set.
Number of Turbines Error: no local variable "turbine" has been set.
CHP Error: no local variable "chp" has been set.
Technology Approach Error: no local variable "techtype" has been set.
Funding Type [[Error: no local variable "funding" has been set.]]

Operators Annual Report


Input Data

Year HH C&I Clin RDF Total


Output Data

Year IBA IBA %ge of Tot IN APC APC %ge of Tot IN

Dudley EFW
Dudley EFW


Summary

An EfW facility based upon conventional combustion technology which is not considered an ERF as a result of not having R1 status. The facility is operated by MES Environmental, now part of Paprec, having agreed to buy out CNIM in March 2021[1]. Delivery of waste is by road and the facility processes primarily residual Household Waste [2].

History

The Dudley facility was built to primarily service residual Household Waste from Dudley Council under a long term PPP contract and has been operational since 1998.

Plant

The plant comprises two lines via standard combustion CNIM boilers, generating super-heated steam, and is configured to run on primarily residual Household Waste and similar residual Commercial Waste with design capability of 6 tonnes per hour or up to 99,000 tonnes per annum and generating 7 MWe.

Local Authority Users

Local Authority Data

The table below lists those local authorities who have recorded their tonnage on WasteDataFlow as sending their Waste to this site (either directly or via a transfer station) for the most recent financial year, data was updated on Error: no local variable "updated" has been set.. The tonnage received cannot be directly compared with the stated historical tonnage received and recorded in the EA statistics as these are recorded on a calendar year basis (i.e. January 2018 to December 2018). The total Local Authority waste received by the plant in the period was: 0t

A 'zero return' or a below expected return, when compared to the EA Data below indicates that either:

  • no local authority tonnage was recorded/no tonnage was sent to the site in the period (but has been listed as it may have previously received tonnage from a local authority) or
  • a result of the plant being recently commissioned and actually having received no tonnage or
  • a lower than expected tonnage maybe a result of a local authority splitting their tonnage over multiple sites, having less tonnage to send than might be anticipated or
  • it may be a new plant being in 'ramp up' towards full capacity after construction or
  • may be a result of plant shut down and subsequent re-start in a year or
  • the local authority may not have correctly entered the site's details on WasteDataFlow


Authority Tonnage

References