Hooton Bio Power: Difference between revisions

From WikiWaste
(Typo)
m (minor text changes)
Line 6: Line 6:


==Summary==
==Summary==
Hooton Bio Power is an EfW facility currently under construction in Ellesmere Port, Cheshire. The facility will utilise [[Advanced Conversion Technology|Advanced Conversion Technologies]] to process 240,000 tonnes of MSW ([[Municipal Solid Waste]]) per annum and generate 25.2 MW of electricity which will be exported to the grid after the facility’s own power needs are met. The facility has been developed by [[CoGen]] with [[BWSC]] as the turnkey EPC contractor and O&M provider. In 2018, the facility was sold to Aviva investors<ref name="ref1" >CoGen, 2018. [https://www.cogenuk.com/projects Projects — CoGen. Online. CoGen. [Accessed 14 Feb. 2020].]</ref>.
Hooton Bio Power is an EfW facility currently under construction in Ellesmere Port, Cheshire. The facility will utilize [[Advanced Conversion Technology|Advanced Conversion Technologies]] to process 240,000 tonnes per annum and generate 25.2 MW of electricity which will be exported to the grid after the facility’s own power needs are met. The facility has been developed by [[CoGen]] with [[BWSC]] as the turnkey [[EPC]] contractor and O&M provider. In 2018, the facility was sold to [[Aviva Investors]]<ref name="ref1" >CoGen, 2018. [https://www.cogenuk.com/projects Projects — CoGen. Online. CoGen. [Accessed 14 Feb. 2020].]</ref>.


==History==
==History==
The project reached financial close in October 2018, with BWSC beginning construction in November 2018. Construction and commissioning is scheduled to end with operations commencing in the second half of 2021<ref name="ref2" >Lets Recycle, 2018. [https://www.letsrecycle.com/news/latest-news/construction-starts-hooton-gasification-plant/ Construction starts at Hooton gasification plant. Online. letsrecycle.com. [Accessed 14 Feb. 2020].]</ref>.  
The project reached financial close in October 2018, with [[BWSC]] beginning construction in November 2018. Construction and commissioning is scheduled to end with operations commencing in the second half of 2021<ref name="ref2" >Lets Recycle, 2018. [https://www.letsrecycle.com/news/latest-news/construction-starts-hooton-gasification-plant/ Construction starts at Hooton gasification plant. Online. letsrecycle.com. [Accessed 14 Feb. 2020].]</ref>.  


==Plant==
==Plant==
The facility will utilise 2 lines of a fluidised bed [[gasification]] system provided by [[Kobelco Eco Solutions]]. [[CoGen]] will continue to be involved in the project’s delivery through long-term Management Service Agreements (MSA)<ref name="ref1" />.  
The facility will utilize 2 lines of a fluidised bed [[Gasification]] system provided by [[Kobelco Eco Solutions]]. [[CoGen]] will continue to be involved in the project’s delivery through long-term Management Service Agreements (MSA)<ref name="ref1" />.  


The Hooton Bio Power facility will be the first non-subsidized merchant [[Gasification]] facility in the UK, and the largest [[Gasification]] facility in the UK of its size and technology type<ref name="ref3" >BWSC, 2018. [https://www.bwsc.com/media/press-releases/2018/award-hooton BWSC awarded deal to deliver UKs largest gasification plant – Hooton Bio Power Resource Recovery Centre Project. Online. Bwsc.com. [Accessed 14 Feb. 2020].]</ref>.
==Waste Input==
The waste aggregator [[N+P]] will supply the waste for the facility, providing locally-sourced waste under a 15-year feedstock supply agreement<ref name="ref1" />.
The waste aggregator [[N+P]] will supply the waste for the facility, providing locally-sourced waste under a 15-year feedstock supply agreement<ref name="ref1" />.
The Hooton Bio Power facility will be the first non-subsidised merchant gasification facility in the UK, and the largest gasification facility in the UK of its size and technology type<ref name="ref3" >BWSC, 2018. [https://www.bwsc.com/media/press-releases/2018/award-hooton BWSC awarded deal to deliver UKs largest gasification plant – Hooton Bio Power Resource Recovery Centre Project. Online. Bwsc.com. [Accessed 14 Feb. 2020].]</ref>.
==Local Authority Users==


==References==
==References==
<references />
<references />

Revision as of 05:54, 22 February 2020

Hooton Bio Power November 2019. CoGen, 2019.
Hooton Bio Power November 2019. CoGen, 2019.


Error: no local variable "site" has been set.
Error: no local variable "status" has been set.
Site Location
Site Location

See Residual EfW → page for a larger UK Wide map.

Waste Licence Error: no local variable "epr" has been set.
Operator [[Error: no local variable "operator" has been set.]]
Region [[:Category:Error: no local variable "region" has been set.|Error: no local variable "region" has been set.]]
Operational Capacity Error: no local variable "cap" has been set.ktpa
Is site R1? Error: no local variable "r1" has been set.
When was R1 Granted? Error: no local variable "r1date" has been set.
What was the R1 value Error: no local variable "r1value" has been set.
Electrical Capacity Error: no local variable "mwe" has been set.MWe
Number of Lines Error: no local variable "line" has been set.
Number of Turbines Error: no local variable "turbine" has been set.
CHP Error: no local variable "chp" has been set.
Technology Approach Error: no local variable "techtype" has been set.
Funding Type [[Error: no local variable "funding" has been set.]]

Operators Annual Report


Input Data

Year HH C&I Clin RDF Total


Output Data

Year IBA IBA %ge of Tot IN APC APC %ge of Tot IN


Summary

Hooton Bio Power is an EfW facility currently under construction in Ellesmere Port, Cheshire. The facility will utilize Advanced Conversion Technologies to process 240,000 tonnes per annum and generate 25.2 MW of electricity which will be exported to the grid after the facility’s own power needs are met. The facility has been developed by CoGen with BWSC as the turnkey EPC contractor and O&M provider. In 2018, the facility was sold to Aviva Investors[1].

History

The project reached financial close in October 2018, with BWSC beginning construction in November 2018. Construction and commissioning is scheduled to end with operations commencing in the second half of 2021[2].

Plant

The facility will utilize 2 lines of a fluidised bed Gasification system provided by Kobelco Eco Solutions. CoGen will continue to be involved in the project’s delivery through long-term Management Service Agreements (MSA)[1].

The Hooton Bio Power facility will be the first non-subsidized merchant Gasification facility in the UK, and the largest Gasification facility in the UK of its size and technology type[3].

Waste Input

The waste aggregator N+P will supply the waste for the facility, providing locally-sourced waste under a 15-year feedstock supply agreement[1].

References