Hooton Bio Power

From WikiWaste
Revision as of 04:45, 14 February 2020 by MCWaste (talk | contribs) (Text)


Error: no local variable "site" has been set.
Error: no local variable "status" has been set.
Site Location
Site Location

See Residual EfW → page for a larger UK Wide map.

Waste Licence Error: no local variable "epr" has been set.
Operator [[Error: no local variable "operator" has been set.]]
Region [[:Category:Error: no local variable "region" has been set.|Error: no local variable "region" has been set.]]
Operational Capacity Error: no local variable "cap" has been set.ktpa
Is site R1? Error: no local variable "r1" has been set.
When was R1 Granted? Error: no local variable "r1date" has been set.
What was the R1 value Error: no local variable "r1value" has been set.
Electrical Capacity Error: no local variable "mwe" has been set.MWe
Number of Lines Error: no local variable "line" has been set.
Number of Turbines Error: no local variable "turbine" has been set.
CHP Error: no local variable "chp" has been set.
Technology Approach Error: no local variable "techtype" has been set.
Funding Type [[Error: no local variable "funding" has been set.]]

Operators Annual Report


Input Data

Year HH C&I Clin RDF Total


Output Data

Year IBA IBA %ge of Tot IN APC APC %ge of Tot IN

Summary

Hooton Bio Power is an EfW facility utilising Advanced Combustion Technologies that is located Ellesmere Port, Cheshire and is currently under construction. The facility will have a capacity of 240,000 tonnes per annum of Municipal Solid Waste and generate 25.2 MW of electricity to be exported to the grid after the plants own power needs are supplied for. The facility has been developed by CoGen with BWSC as the turnkey EPC contractor and providing O&M services, the EfW is 100% owned by Aviva investors. The waste aggregator N+P will be the waste supplier for the plant, providing locally sourced waste under a 15-year feedstock supply agreement[1].

History

The facility reached financial close in October 2018, with BWSC beginning construction in November 2018. Consturuction and commissioning is scheduled to end with operations commencing in the second half of 2021[2].

Plant

The technology the plant will employ is 2 lines of a fluidised bed gasification system provided by Kobelco Eco Solutions. CoGen will continue to be involved in the project’s delivery through long-term Management Service Agreements (MSA).[1].

The Hooton Bio Power facility will be the first non-subsidised merchant gasification facility in the UK, and the largest gasification facility in the UK of its size and technology type[3].


Local Authority Users

References