Lerwick Energy Recovery Plant (Shetland EfW Plant)
Lerwick Energy Recovery Plant (Shetland EfW Plant) Operational | |
See Residual EfW → page for a larger UK Wide map. | |
Waste Licence | PPC/A/1003141 |
Operator | Shetland Heat Energy & Power (SHEAP) |
Region | Scotland |
Operational Capacity | 24ktpa |
Is site R1? | No |
When was R1 Granted? | |
What was the R1 value | 0.00 |
Electrical Capacity | 7.00MWe |
Number of Lines | 1 |
Number of Turbines | 1 |
CHP | Yes |
Technology Approach | EfW Incineration |
Funding Type | Merchant |
Operators Annual Report
Input Data
Year | HH | C&I | Clin | RDF | Total |
---|---|---|---|---|---|
2016 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
2017 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
2018 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
2019 | 19270.00 | 0.00 | 1312.00 | 0.00 | 20749.00 |
2020 | 22576.00 | 0.00 | 107.00 | 0.00 | 22786.00 |
2021 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
2022 | 22793.00 | 0.00 | 108.00 | 0.00 | 23066.00 |
Output Data
Year | IBA | IBA %ge of Tot IN | APC | APC %ge of Tot IN |
---|---|---|---|---|
2016 | 0.00 | 0.00% | 0.00 | 0.00% |
2017 | 0.00 | 0.00% | 0.00 | 0.00% |
2018 | 0.00 | 0.00% | 0.00 | 0.00% |
2019 | 0.00 | 0.00% | 0.00 | 0.00% |
2020 | 0.00 | 0.00% | 0.00 | 0.00% |
2021 | 0.00 | 0.00% | 0.00 | 0.00% |
2022 | 0.00 | 0.00% | 0.00 | 0.00% |