An EfW facility based upon conventional combustion technology and considered an ERF based on its R1 status. The North Hykenham Energy from Waste facility as its also known has a permitted operational capacity of 190,000 tonnes per annum, and is owned and operated by FCC Environment. The waste arrives on 10 and 25 tonne collection vehicles from the local Lincoln area and five waste transfer stations based in Boston, Gainsborough, Grantham, Louth and Sleaford. <ref name="NH">https://www.fccenvironment.co.uk/green-energy/lincoln/</ref> The facility processes primarily residual [[Household Waste]] and some [[Commercial Waste]].


==History==
==History==

Revision as of 05:07, 25 February 2020


Lincolnshire EFW
Operational
Site Location
Site Location

See Residual EfW → page for a larger UK Wide map.

Waste Licence FP3739FS
Operator FCC Environment
Region East Midlands
Operational Capacity 190ktpa
Is site R1? Yes
When was R1 Granted? 2016-04-18
What was the R1 value 0.68
Electrical Capacity 13.10MWe
Number of Lines 1
Number of Turbines 1
CHP Yes
Technology Approach EfW Incineration
Funding Type PPP

Operators Annual Report


Input Data

Year HH C&I Clin RDF Total
2016 162026.00 1554.00 0.00 0.00 163580.00
2017 167595.00 1164.00 0.00 0.00 168759.00
2018 168990.00 1911.00 5.00 0.00 170910.00
2019 169181.00 6293.00 0.00 0.00 177546.00
2020 179431.00 5400.00 0.00 0.00 184831.00
2021 165846.00 5027.00 450.00 0.00 171323.00
2022 168835.00 3227.00 0.00 0.00 172062.00


Output Data

Year IBA IBA %ge of Tot IN APC APC %ge of Tot IN
2016 35987.60 22.00% 1635.80 1.00%
2017 35439.40 21.00% 1687.59 1.00%
2018 38281.86 22.40% 4016.18 2.35%
2019 38277.00 21.56% 4064.00 2.29%
2020 39585.00 21.42% 4108.00 2.22%
2021 36531.00 21.32% 3930.00 2.29%
2022 36894.00 21.44% 979.00 0.57%

Summary

An EfW facility based upon conventional combustion technology and considered an ERF based on its R1 status. The North Hykenham Energy from Waste facility as its also known has a permitted operational capacity of 190,000 tonnes per annum, and is owned and operated by FCC Environment. The waste arrives on 10 and 25 tonne collection vehicles from the local Lincoln area and five waste transfer stations based in Boston, Gainsborough, Grantham, Louth and Sleaford. [1] The facility processes primarily residual Household Waste and some Commercial Waste.

History

Plant

Local Authority Users

The following data comes from WasteDataFlow for the financial year 2018/19 and represents those local authorities recorded as putting tonnage into the site (either directly or via a transfer station). The tonnage received cannot be directly compared with the stated historical tonnage received and recorded in the EA statistics as these are recorded on a calendar year basis (i.e. January 2018 to December 2018). A 'zero return' below indicates no local authority tonnage was recorded, most likely a result of the plant being recently commissioned and actually having received no tonnage. Equally, lower than expected tonnage maybe a result of either a new plant being in 'ramp up' towards full capacity after construction, or may be a result of plant shut down and subsequent re-start in a year.


Authority Tonnage
Lincolnshire County Council 170297.310

References