Newlincs EfW: Difference between revisions

From WikiWaste
(Imported from text file)
 
(add page specific text)
Line 1: Line 1:
[[File:Cyclerval Newlincs.png|350px|left|Cyclerval New Lincs: Attributed to Alan Murray-Rust, CC BY-SA 2.0]]
[[Category:EfW Plants]][[Category:Tonnage & Waste Types]][[Category:Technologies & Solutions]]
[[Category:EfW Plants]][[Category:Tonnage & Waste Types]][[Category:Technologies & Solutions]]
{{EfWTemplate|EPR=BT4249IB|id=43}}
{{EfWTemplate|EPR=BT4249IB|id=43}}


==Summary==
==Summary==
An [[EfW]] facility based upon conventional combustion technology and not considered an [[ERF]] as yet based upon it not having [[R1]] status. Newlincs has permitted operational capacity of 60,000 tonnes per annum, owned and operated by [[Cyclerval-UK]]. Delivery of waste is by road and the facility processes primarily residual [[Household Waste]].


==History==
==History==
The Newlincs facility was built primarily to service a 25 year [[PFI]] contract signed in 1999 with [[North East Lincolnshire Council]], with anticipated total throughput of up to 56,000 tonnes per annum<ref>[http://www.newlincs.com/home.html Newlincs Website]</ref>. The site is located between Grimsby and Immingham.


==Plant==
==Plant==
Built by [[TIRU SA]] (now part of [[Dalkia]]<ref>[https://www.dalkiawastenergy.com/history-tiru Dalkia Waste Energy Website]</ref>, part of the [[EDF Group]]) under a Design & Build [[EPC]]-turnkey contract which was delivered and operational in 2003 it is similar to the [[Exeter Energy Recovery Facility|Exeter]].
The plant comprises of one line with a design capacity capable of treating 60,000 tonnes per annum via standard combustion technology comprising an oscillating kiln, generating super-heated steam, and is configured to run on primarily residual [[Household Waste]]. Power output design is reported is 4MWe for [[Exeter Energy Recovery Facility|Exeter]], but electrical capacity is shown as 3.2MWe, consistent with other reported figures.


==Local Authority Users==
==Local Authority Users==

Revision as of 11:43, 6 February 2020

Cyclerval New Lincs: Attributed to Alan Murray-Rust, CC BY-SA 2.0
Cyclerval New Lincs: Attributed to Alan Murray-Rust, CC BY-SA 2.0


Newlincs EfW
Operational
Site Location
Site Location

See Residual EfW → page for a larger UK Wide map.

Waste Licence BT4249IB
Operator Newlincs Developments, TIRU
Region Yorkshire and the Humber
Operational Capacity 56ktpa
Is site R1? No
When was R1 Granted?
What was the R1 value 0.00
Electrical Capacity 3.20MWe
Number of Lines 1
Number of Turbines 1
CHP Yes
Technology Approach EfW Incineration
Funding Type PPP

Operators Annual Report


Input Data

Year HH C&I Clin RDF Total
2016 54855.00 0.00 0.00 0.00 54855.00
2017 54363.00 0.00 0.00 0.00 54363.00
2018 42967.00 8513.00 0.00 0.00 51480.00
2019 44508.00 6755.00 0.00 0.00 51263.00
2020 53004.00 1163.00 0.00 0.00 54167.00
2021 49039.00 2282.00 0.00 0.00 51321.00
2022 47868.00 3381.00 0.00 0.00 51249.00


Output Data

Year IBA IBA %ge of Tot IN APC APC %ge of Tot IN
2016 9396.00 17.13% 2690.00 4.90%
2017 9023.00 16.60% 2500.00 4.60%
2018 8019.00 15.58% 2250.00 4.37%
2019 8017.00 15.64% 2355.00 4.59%
2020 8832.00 16.31% 2403.00 4.44%
2021 8359.00 16.29% 2069.00 4.03%
2022 7760.00 15.14% 1770.00 3.45%

Summary

An EfW facility based upon conventional combustion technology and not considered an ERF as yet based upon it not having R1 status. Newlincs has permitted operational capacity of 60,000 tonnes per annum, owned and operated by Cyclerval-UK. Delivery of waste is by road and the facility processes primarily residual Household Waste.

History

The Newlincs facility was built primarily to service a 25 year PFI contract signed in 1999 with North East Lincolnshire Council, with anticipated total throughput of up to 56,000 tonnes per annum[1]. The site is located between Grimsby and Immingham.

Plant

Built by TIRU SA (now part of Dalkia[2], part of the EDF Group) under a Design & Build EPC-turnkey contract which was delivered and operational in 2003 it is similar to the Exeter. The plant comprises of one line with a design capacity capable of treating 60,000 tonnes per annum via standard combustion technology comprising an oscillating kiln, generating super-heated steam, and is configured to run on primarily residual Household Waste. Power output design is reported is 4MWe for Exeter, but electrical capacity is shown as 3.2MWe, consistent with other reported figures.

Local Authority Users

References