Runcorn EfW: Difference between revisions

From WikiWaste
(Imported from text file)
 
m (add page specific text)
Line 3: Line 3:


==Summary==
==Summary==
[[File:Viridor Runcorn pic.png|400px|left|Runcorn 1&2 ERF (from )]]


==History==
==History==
The Runcorn facility was built in two phases, the initial capacity focused on the solution delivered as part of the [[PFI]] for [[Greater Manchester Waste Disposal Authority | GMWDA]] and was then subsequently extended to deliver a capacity of 850,000 tonnes per annum. At a later stage the permitted capacity was further extended to 1,100,000 tonnes per annum to reflect the lower [[Calorific Value]] of the fuel delivered than was anticipated in the design. The facility is a [[CHP]] plant, based on [[Ineous Chlor]]'s site in Runcorn, delivering 51MW of heat for their adjacent chemical manufacturing site <ref>[https://www.viridor.co.uk/energy/energy-recovery-facilities/runcorn-erf/%20link Viridor Website Link]</ref>


==Plant==
==Plant==
Built by AE&E Inova AG which is now [[Hitachi Zosen Inova AG]] (part of the Hitachi Zosen Corportation)


==Local Authority Users==
==Local Authority Users==

Revision as of 10:11, 3 February 2020


Error: no local variable "site" has been set.
Error: no local variable "status" has been set.
Site Location
Site Location

See Residual EfW → page for a larger UK Wide map.

Waste Licence Error: no local variable "epr" has been set.
Operator [[Error: no local variable "operator" has been set.]]
Region [[:Category:Error: no local variable "region" has been set.|Error: no local variable "region" has been set.]]
Operational Capacity Error: no local variable "cap" has been set.ktpa
Is site R1? Error: no local variable "r1" has been set.
When was R1 Granted? Error: no local variable "r1date" has been set.
What was the R1 value Error: no local variable "r1value" has been set.
Electrical Capacity Error: no local variable "mwe" has been set.MWe
Number of Lines Error: no local variable "line" has been set.
Number of Turbines Error: no local variable "turbine" has been set.
CHP Error: no local variable "chp" has been set.
Technology Approach Error: no local variable "techtype" has been set.
Funding Type [[Error: no local variable "funding" has been set.]]

Operators Annual Report


Input Data

Year HH C&I Clin RDF Total


Output Data

Year IBA IBA %ge of Tot IN APC APC %ge of Tot IN

Summary

Runcorn 1&2 ERF (from )
Runcorn 1&2 ERF (from )

History

The Runcorn facility was built in two phases, the initial capacity focused on the solution delivered as part of the PFI for GMWDA and was then subsequently extended to deliver a capacity of 850,000 tonnes per annum. At a later stage the permitted capacity was further extended to 1,100,000 tonnes per annum to reflect the lower Calorific Value of the fuel delivered than was anticipated in the design. The facility is a CHP plant, based on Ineous Chlor's site in Runcorn, delivering 51MW of heat for their adjacent chemical manufacturing site [1]

Plant

Built by AE&E Inova AG which is now Hitachi Zosen Inova AG (part of the Hitachi Zosen Corportation)

Local Authority Users

References