Runcorn EfW: Difference between revisions

From WikiWaste
No edit summary
m (add page specific text)
Line 5: Line 5:
[[File:Viridor Runcorn pic.png|400px|left|Runcorn 1&2 ERF (from )]]
[[File:Viridor Runcorn pic.png|400px|left|Runcorn 1&2 ERF (from )]]
One of the largest [[ERF]] facilities in the UK with permitted operational capacity of 1,100,000 tonnes per annum, operated by [[Viridor]] and owned by [[Viridor]] and [[Ineous Chlor]]. Delivery of waste is by both road and rail and the facility processes both residual [[Household Waste]] and [[Commercial Waste]] in the form of [[RDF]]<ref>[https://www.viridor.co.uk/energy/energy-recovery-facilities/runcorn-erf/%20link Viridor Website Link]</ref>
One of the largest [[ERF]] facilities in the UK with permitted operational capacity of 1,100,000 tonnes per annum, operated by [[Viridor]] and owned by [[Viridor]] and [[Ineous Chlor]]. Delivery of waste is by both road and rail and the facility processes both residual [[Household Waste]] and [[Commercial Waste]] in the form of [[RDF]]<ref>[https://www.viridor.co.uk/energy/energy-recovery-facilities/runcorn-erf/%20link Viridor Website Link]</ref>


==History==
==History==
The Runcorn facility was built in two phases with 425,000 tonnes per annum capacity in each phase. The initial capacity focused on the solution delivered as part of the [[PFI]] for [[Greater Manchester Combined Authority | GMWDA]] and was then subsequently extended to deliver a capacity of 850,000 tonnes per annum. At a later stage the permitted capacity was further extended to 1,100,000 tonnes per annum to reflect the lower [[Calorific Value]] of the fuel delivered than was anticipated in the design. The facility is a [[CHP]] plant, based on [[Ineous Chlor]]'s site in Runcorn, delivering 51MW of heat for their adjacent chemical manufacturing site  
The Runcorn facility was built in two phases with 425,000 tonnes per annum capacity in each phase. The initial capacity focused on the solution delivered as part of the [[PFI]] for [[Greater Manchester Combined Authority | GMWDA]] and was then subsequently extended to deliver a capacity of 1,100,000 tonnes per annum to reflect the lower [[Calorific Value]] of the fuel delivered than was anticipated in the design for 850,000 tonnes per annum. The facility is a [[CHP]] plant, located on [[Ineous Chlor]]'s site in Runcorn, generating 83MWe of electricity (design point vs 100MWe listed capacity) and 51MWth of heat for the adjacent chemical manufacturing site  
==Plant==
==Plant==
Built by [[Keppel Seghers]] under a Design & Build [[EPC]]-turnkey contract phase 1 was handed over in January 2015, and phase 2 in April 2015 at a contract value of GBP £390 million <ref>[http://www.keppelseghers.com/en/content.aspx?sid=3 Keppel Seghers Website]</ref>.
Built by [[Keppel Seghers]] under a Design & Build [[EPC]]-turnkey contract phase 1 was commenced in 2009 and handed over in January 2015, and phase 2 was commenced in 2010 and handed over in April 2015 at a contract value of GBP £390 million <ref>[http://www.keppelseghers.com/en/content.aspx?sid=3 Keppel Seghers Website]</ref>.
The plant comprises 4 lines (2 in each phase) of standard combustion technology generating superheated steam, and is designed to run on [[RDF]] with an average [[CV]] of 11.5MJ/kg
The plant comprises 4 lines (2 in each phase) of standard combustion technology generating super-heated steam, and is configured to run on [[RDF]] with a 'design point' [[CV]] of 11.5MJ/kg


==Local Authority Users==
==Local Authority Users==

Revision as of 10:47, 3 February 2020


Error: no local variable "site" has been set.
Error: no local variable "status" has been set.
Site Location
Site Location

See Residual EfW → page for a larger UK Wide map.

Waste Licence Error: no local variable "epr" has been set.
Operator [[Error: no local variable "operator" has been set.]]
Region [[:Category:Error: no local variable "region" has been set.|Error: no local variable "region" has been set.]]
Operational Capacity Error: no local variable "cap" has been set.ktpa
Is site R1? Error: no local variable "r1" has been set.
When was R1 Granted? Error: no local variable "r1date" has been set.
What was the R1 value Error: no local variable "r1value" has been set.
Electrical Capacity Error: no local variable "mwe" has been set.MWe
Number of Lines Error: no local variable "line" has been set.
Number of Turbines Error: no local variable "turbine" has been set.
CHP Error: no local variable "chp" has been set.
Technology Approach Error: no local variable "techtype" has been set.
Funding Type [[Error: no local variable "funding" has been set.]]

Operators Annual Report


Input Data

Year HH C&I Clin RDF Total


Output Data

Year IBA IBA %ge of Tot IN APC APC %ge of Tot IN

Summary

Runcorn 1&2 ERF (from )
Runcorn 1&2 ERF (from )

One of the largest ERF facilities in the UK with permitted operational capacity of 1,100,000 tonnes per annum, operated by Viridor and owned by Viridor and Ineous Chlor. Delivery of waste is by both road and rail and the facility processes both residual Household Waste and Commercial Waste in the form of RDF[1]





History

The Runcorn facility was built in two phases with 425,000 tonnes per annum capacity in each phase. The initial capacity focused on the solution delivered as part of the PFI for GMWDA and was then subsequently extended to deliver a capacity of 1,100,000 tonnes per annum to reflect the lower Calorific Value of the fuel delivered than was anticipated in the design for 850,000 tonnes per annum. The facility is a CHP plant, located on Ineous Chlor's site in Runcorn, generating 83MWe of electricity (design point vs 100MWe listed capacity) and 51MWth of heat for the adjacent chemical manufacturing site

Plant

Built by Keppel Seghers under a Design & Build EPC-turnkey contract phase 1 was commenced in 2009 and handed over in January 2015, and phase 2 was commenced in 2010 and handed over in April 2015 at a contract value of GBP £390 million [2]. The plant comprises 4 lines (2 in each phase) of standard combustion technology generating super-heated steam, and is configured to run on RDF with a 'design point' CV of 11.5MJ/kg

Local Authority Users

References