Teeside EfW - lines 1-5 (Teeside & NEERC), Billingham. line 3: Difference between revisions
(Imported from text file) |
m (add page specific text) |
||
Line 7: | Line 7: | ||
==Plant== | ==Plant== | ||
Built by AE&E Inova AG which is now [[Hitachi Zosen Inova AG]] (part of the Hitachi Zosen Corportation) | |||
==Local Authority Users== | ==Local Authority Users== | ||
==References== | ==References== | ||
<references /> | <references /> |
Revision as of 10:13, 3 February 2020
Teeside EfW - lines 1-5 (Teeside & NEERC), Billingham. line 3 Operational | |
See Residual EfW → page for a larger UK Wide map. | |
Waste Licence | VP3034SG |
Operator | SUEZ |
Region | North East |
Operational Capacity | 756ktpa |
Is site R1? | Yes |
When was R1 Granted? | 2015-06-24 |
What was the R1 value | 0.68 |
Electrical Capacity | 55.00MWe |
Number of Lines | 5 |
Number of Turbines | 3 |
CHP | Yes |
Technology Approach | EfW Incineration |
Funding Type | PPP |
Operators Annual Report
Input Data
Year | HH | C&I | Clin | RDF | Total |
---|---|---|---|---|---|
2016 | 614288.00 | 0.00 | 0.00 | 0.00 | 614288.00 |
2017 | 563349.00 | 0.00 | 0.00 | 0.00 | 563349.00 |
2018 | 613206.00 | 19372.00 | 4692.00 | 0.00 | 637270.00 |
2019 | 639251.00 | 11856.00 | 2896.00 | 0.00 | 654003.00 |
2020 | 666034.00 | 12409.00 | 3109.00 | 0.00 | 681552.00 |
2021 | 659794.00 | 12834.00 | 3787.00 | 0.00 | 676415.00 |
2022 | 662061.00 | 13281.00 | 4072.00 | 0.00 | 679414.00 |
Output Data
Year | IBA | IBA %ge of Tot IN | APC | APC %ge of Tot IN |
---|---|---|---|---|
2016 | 144127.00 | 23.46% | 23848.72 | 3.88% |
2017 | 137380.00 | 24.39% | 28120.87 | 4.99% |
2018 | 157612.40 | 24.73% | 23790.78 | 3.73% |
2019 | 151991.00 | 23.24% | 24364.00 | 3.73% |
2020 | 168729.00 | 24.76% | 24047.00 | 3.53% |
2021 | 168199.00 | 24.87% | 22143.00 | 3.27% |
2022 | 165364.00 | 24.34% | 22501.00 | 3.31% |
Summary
History
Plant
Built by AE&E Inova AG which is now Hitachi Zosen Inova AG (part of the Hitachi Zosen Corportation)