Teeside EfW - lines 1-5 (Teeside & NEERC), Billingham. line 3: Difference between revisions

From WikiWaste
(Imported from text file)
 
m (add page specific text)
Line 7: Line 7:


==Plant==
==Plant==
 
Built by AE&E Inova AG which is now [[Hitachi Zosen Inova AG]] (part of the Hitachi Zosen Corportation)
==Local Authority Users==
==Local Authority Users==


==References==
==References==
<references />
<references />

Revision as of 10:13, 3 February 2020


Teeside EfW - lines 1-5 (Teeside & NEERC), Billingham. line 3
Operational
Site Location
Site Location

See Residual EfW → page for a larger UK Wide map.

Waste Licence VP3034SG
Operator SUEZ
Region North East
Operational Capacity 756ktpa
Is site R1? Yes
When was R1 Granted? 2015-06-24
What was the R1 value 0.68
Electrical Capacity 55.00MWe
Number of Lines 5
Number of Turbines 3
CHP Yes
Technology Approach EfW Incineration
Funding Type PPP

Operators Annual Report


Input Data

Year HH C&I Clin RDF Total
2016 614288.00 0.00 0.00 0.00 614288.00
2017 563349.00 0.00 0.00 0.00 563349.00
2018 613206.00 19372.00 4692.00 0.00 637270.00
2019 639251.00 11856.00 2896.00 0.00 654003.00
2020 666034.00 12409.00 3109.00 0.00 681552.00
2021 659794.00 12834.00 3787.00 0.00 676415.00
2022 662061.00 13281.00 4072.00 0.00 679414.00


Output Data

Year IBA IBA %ge of Tot IN APC APC %ge of Tot IN
2016 144127.00 23.46% 23848.72 3.88%
2017 137380.00 24.39% 28120.87 4.99%
2018 157612.40 24.73% 23790.78 3.73%
2019 151991.00 23.24% 24364.00 3.73%
2020 168729.00 24.76% 24047.00 3.53%
2021 168199.00 24.87% 22143.00 3.27%
2022 165364.00 24.34% 22501.00 3.31%

Summary

History

Plant

Built by AE&E Inova AG which is now Hitachi Zosen Inova AG (part of the Hitachi Zosen Corportation)

Local Authority Users

References