Vine Street EfW (Kirkless EfW)

From WikiWaste
Revision as of 08:29, 3 February 2020 by Admin (talk | contribs) (Imported from text file)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)


Vine Street EfW (Kirkless EfW)
Operational
Site Location
Site Location

See Residual EfW → page for a larger UK Wide map.

Waste Licence BJ6178IX
Operator SUEZ
Region Yorkshire and the Humber
Operational Capacity 135ktpa
Is site R1? Yes
When was R1 Granted? 2015-05-28
What was the R1 value 0.66
Electrical Capacity 9.50MWe
Number of Lines 1
Number of Turbines 1
CHP Yes
Technology Approach EfW Incineration
Funding Type PFI

Operators Annual Report


Input Data

Year HH C&I Clin RDF Total
2016 127510.00 0.00 0.00 0.00 127510.00
2017 132448.00 0.00 0.00 0.00 132448.00
2018 124477.00 0.00 0.00 0.00 124477.00
2019 129599.00 4066.00 278.00 0.00 133943.00
2020 121147.00 2739.00 343.00 0.00 124229.00
2021 132156.00 1652.00 775.00 0.00 134583.00
2022 118915.00 587.00 710.00 0.00 120212.00


Output Data

Year IBA IBA %ge of Tot IN APC APC %ge of Tot IN
2016 25528.00 20.02% 5114.00 4.01%
2017 26852.00 20.27% 4915.00 3.71%
2018 25074.00 20.14% 4713.00 3.79%
2019 26098.00 19.48% 5001.00 3.73%
2020 25794.00 20.76% 4441.00 3.57%
2021 47041.00 34.95% 8260.00 6.14%
2022 24055.00 20.01% 4058.00 3.38%

Summary

History

Plant

Local Authority Users

References