South Ferriby Cement Kiln

From WikiWaste

South Ferriby Cement Kiln is located at Barton-upon-Humber and is owned by Cemex.


South Ferriby Cement Kiln
Site Location
Site Location

See Cement Kilns → page for a larger UK Wide map.

Waste Licence BL1029IP
Operator Cemex
Parent Company Cemex SAB de CV
Clinker Capacity 0.75 Mt

Summary site information collated from a variety of sources.

South Ferriby Cement Kiln - Source GlobalCement.com
South Ferriby Cement Kiln - Source GlobalCement.com


Overview

WikiWaste has used the website Cement Plants and Kilns in Britain and Ireland[1] extensively for the reference material for each individual cement kiln page. The detail on this reference website is extensive and as WikiWaste is focused upon the UK waste and resource market, only the key highlights are captured from this website (and company websites accordingly) to provide background and context. South Ferriby started manufacturing clinker in 1938 and up to 2015 had produced 25 million tonnes of clinker through 3 rotary kilns over this period.

Ownership

  • 1938 to 1962 Eastwoods Ltd
  • 1962 to 1979 Rugby Portland Cement Co. Ltd
  • 1979 to 2000 Rugby Group
  • 2000 to 2005 RMC
  • 2005 to Present Cemex

The Process at South Ferriby

There are two kilns operating on the site, one supplied by Polysius and one by FLS (FLSmidth).

Raw Materials

The primary raw materials are chalk and clay taken from different areas of the same adjacent quarry[2].

Waste Tonnage, EWC List

The table shows a list of the Waste for the Permit BL1029IP, that has arrived into sites as reported to the Regulator and then publicised in their reported statistics. The Data was last updated in October 2023. The total reported tonnage arriving at the site was: 435.52t.

EWC Code Description Tonnes In
10 13 12* solid wastes from gas treatment containing dangerous substances 435.52


Waste Tonnage, By Origin

The table shows a list of the Waste for the Permit BL1029IP, that has arrived into sites as reported to the Regulator and then publicised in their reported statistics. The Data was last updated on October 2023. The total reported tonnage arriving at the site was: 435.52t.  

EWC Code Origin of Waste Tonnes In
10 13 12* Rugby 435.52


The proportion of the RDF/SRF tonnage used by Cemex is referred to by the company as Climafuel.