Lakeside EfW: Difference between revisions

Arctellion (talk | contribs)
No edit summary
Arctellion (talk | contribs)
No edit summary
 
Line 14: Line 14:
Built by [[Itochu-Takuma]] under an [[EPC]]-turnkey contract and was delivered in January 2010 at a reported <ref>[https://www.mrw.co.uk/home/160m-lakeside-efw-taken-over-by-grundon/viridor-partnership/3006204.article MRW Article]</ref> £160m capital cost, comprising conventional moving [[grate]] [[combustion]] technology and generating a design output of 37MWe (vs the capacity of 30MWe listed).
Built by [[Itochu-Takuma]] under an [[EPC]]-turnkey contract and was delivered in January 2010 at a reported <ref>[https://www.mrw.co.uk/home/160m-lakeside-efw-taken-over-by-grundon/viridor-partnership/3006204.article MRW Article]</ref> £160m capital cost, comprising conventional moving [[grate]] [[combustion]] technology and generating a design output of 37MWe (vs the capacity of 30MWe listed).


==Local Authority Users==
{{EfWLAData|EPR={{#var: epr}}}}
{{EfWLAData|EPR={{#var: epr}}}}
{{EAIn|EPR={{#var: epr}}}}
==References==
==References==


<references />
<references />