Lakeside EfW: Difference between revisions
Arctellion (talk | contribs) No edit summary |
Arctellion (talk | contribs) No edit summary |
||
| Line 14: | Line 14: | ||
Built by [[Itochu-Takuma]] under an [[EPC]]-turnkey contract and was delivered in January 2010 at a reported <ref>[https://www.mrw.co.uk/home/160m-lakeside-efw-taken-over-by-grundon/viridor-partnership/3006204.article MRW Article]</ref> £160m capital cost, comprising conventional moving [[grate]] [[combustion]] technology and generating a design output of 37MWe (vs the capacity of 30MWe listed). | Built by [[Itochu-Takuma]] under an [[EPC]]-turnkey contract and was delivered in January 2010 at a reported <ref>[https://www.mrw.co.uk/home/160m-lakeside-efw-taken-over-by-grundon/viridor-partnership/3006204.article MRW Article]</ref> £160m capital cost, comprising conventional moving [[grate]] [[combustion]] technology and generating a design output of 37MWe (vs the capacity of 30MWe listed). | ||
{{EfWLAData|EPR={{#var: epr}}}} | {{EfWLAData|EPR={{#var: epr}}}} | ||
{{EAIn|EPR={{#var: epr}}}} | |||
==References== | ==References== | ||
<references /> | <references /> | ||