Lakeside EfW: Difference between revisions

Bin52 (talk | contribs)
m expanded text
Arctellion (talk | contribs)
No edit summary
 
(9 intermediate revisions by 4 users not shown)
Line 1: Line 1:
[[File:Viridor Lakeside.png|370px|left|Viridor Lakeside]]
{{#vardefine: epr|BT7116IW}}
[[Category:EfW Plants]][[Category:Tonnage & Waste Types]][[Category:Technologies & Solutions]]
[[Category:EfW Plants]]
{{EfWTemplate|EPR=BT7116IW|id=8}}
An [[EfW]] facility based upon conventional [[combustion]] technology and considered an [[ERF]] based on its [[R1]] status. [[Lakeside EfW]] has permitted operational capacity of 450,000 tonnes per annum, operated by [[Lakeside Energy From Waste Ltd]] a joint venture between [[Viridor]] and [[Grundon]]. Delivery of waste is by road, with a location close to the M25/M4 intersection, and the facility processes primarily residual [[Household Waste]] and [[Commercial Waste]]<ref>[https://www.viridor.co.uk/energy/energy-recovery-facilities/lakeside-efw/ Viridor Website]</ref>. The construction of the third runway at [[wikipedia:Heathrow Airport|Heathrow Airport]] would have necessitated the movement of the facility, with plans submitted in June 2019 to Slough Borough Council <ref>[https://www.letsrecycle.com/news/latest-news/plans-for-replacement-lakeside-efw-submitted/ Letsrecycle article]</ref> most recently reported in late 2020 as withdrawn as an application in [[DEFRA]] data.
 
{{EfWTemplate|EPR={{#var:epr}}|id=8}}
[[File:Viridor Lakeside.png|370px|left|Viridor Lakeside]]__TOC__
<br clear='left' />
==Summary==
==Summary==
An [[EfW]] facility based upon conventional combustion technology and considered an [[ERF]] based on its [[R1]] status. Lakeside has permitted operational capacity of 450,000 tonnes per annum, operated by [[Lakeside Energy from Waste Ltd]] a joint venture between [[Viridor]] and [[Grundon]]. Delivery of waste is by road, with a location close to the M25/M4 intersection, and the facility processes primarily residual [[Household Waste]] and [[Commercial Waste]]<ref>[https://www.viridor.co.uk/energy/energy-recovery-facilities/lakeside-efw/ Viridor Website]</ref>. The construction of the third runway at Heathrow Airport will necessitate the movement of the facility, with plans submitted in June 2019 to Slough Borough Council <ref>[https://www.letsrecycle.com/news/latest-news/plans-for-replacement-lakeside-efw-submitted/ Letsrecycle article]</ref>.
An [[EfW]] facility based upon conventional [[combustion]] technology and considered an [[ERF]] based on its [[R1]] status. [[Lakeside EfW]] has permitted operational capacity of 450,000 tonnes per annum, operated by [[Lakeside Energy from Waste Ltd]] a joint venture between [[Viridor]] and [[Grundon]]. Delivery of waste is by road, with a location close to the M25/M4 intersection, and the facility processes primarily residual [[Household Waste]] and [[Commercial Waste]]<ref>[https://www.viridor.co.uk/energy/energy-recovery-facilities/lakeside-efw/ Viridor Website]</ref>. The construction of the third runway at [[wikipedia:Heathrow Airport|Heathrow Airport]] would have necessitated the movement of the facility, with plans submitted in June 2019 to Slough Borough Council <ref>[https://www.letsrecycle.com/news/latest-news/plans-for-replacement-lakeside-efw-submitted/ Letsrecycle article]</ref> most recently reported in late 2020 as withdrawn as an application in [[DEFRA]] data.


==History==
==History==
Line 10: Line 12:


==Plant==
==Plant==
Built by [[Itochu-Takuma]] under an [[EPC]]-turnkey contract and was delivered in January 2010 at a reported <ref>[https://www.mrw.co.uk/home/160m-lakeside-efw-taken-over-by-grundon/viridor-partnership/3006204.article MRW Article]</ref> £160m capital cost, comprising conventional moving grate combustion technology and generating a design output of 37MWe (vs the capacity of 30MWe listed).
Built by [[Itochu-Takuma]] under an [[EPC]]-turnkey contract and was delivered in January 2010 at a reported <ref>[https://www.mrw.co.uk/home/160m-lakeside-efw-taken-over-by-grundon/viridor-partnership/3006204.article MRW Article]</ref> £160m capital cost, comprising conventional moving [[grate]] [[combustion]] technology and generating a design output of 37MWe (vs the capacity of 30MWe listed).


==Local Authority Users==
{{EfWLAData|EPR={{#var: epr}}}}
 
{{EAIn|EPR={{#var: epr}}}}


==References==
==References==
<references />
<references />