An [[EfW]] facility based upon conventional [[combustion]] technology and considered an [[ERF]] based on its [[R1]] status. [[Lakeside EfW]] has permitted operational capacity of 450,000 tonnes per annum, operated by [[Lakeside Energy From Waste Ltd]] a joint venture between [[Viridor]] and [[Grundon]]. Delivery of waste is by road, with a location close to the M25/M4 intersection, and the facility processes primarily residual [[Household Waste]] and [[Commercial Waste]]<ref>[https://www.viridor.co.uk/energy/energy-recovery-facilities/lakeside-efw/ Viridor Website]</ref>. The construction of the third runway at [[wikipedia:Heathrow Airport|Heathrow Airport]] would have necessitated the movement of the facility, with plans submitted in June 2019 to Slough Borough Council <ref>[https://www.letsrecycle.com/news/latest-news/plans-for-replacement-lakeside-efw-submitted/ Letsrecycle article]</ref> most recently reported in late 2020 as withdrawn as an application in [[DEFRA]] data.
 
{{EfWTemplate|EPR={{#var:epr}}|id=8}}
[[File:Viridor Lakeside.png|370px|left|Viridor Lakeside]]__TOC__
<br clear='left' />
==Summary==
==Summary==
An [[EfW]] facility based upon conventional combustion technology and considered an [[ERF]] based on its [[R1]] status. Lakeside has permitted operational capacity of 450,000 tonnes per annum, operated by [[Lakeside Energy from Waste Ltd]] a joint venture between [[Viridor]] and [[Grundon]]. Delivery of waste is by road, with a location close to the M25/M4 intersection, and the facility processes primarily residual [[Household Waste]] and [[Commercial Waste]]<ref>[https://www.viridor.co.uk/energy/energy-recovery-facilities/lakeside-efw/ Viridor Website]</ref>. The construction of the third runway at Heathrow Airport will necessitate the movement of the facility, with plans submitted in June 2019 to Slough Borough Council <ref>[https://www.letsrecycle.com/news/latest-news/plans-for-replacement-lakeside-efw-submitted/ Letsrecycle article]</ref>.
An [[EfW]] facility based upon conventional [[combustion]] technology and considered an [[ERF]] based on its [[R1]] status. [[Lakeside EfW]] has permitted operational capacity of 450,000 tonnes per annum, operated by [[Lakeside Energy from Waste Ltd]] a joint venture between [[Viridor]] and [[Grundon]]. Delivery of waste is by road, with a location close to the M25/M4 intersection, and the facility processes primarily residual [[Household Waste]] and [[Commercial Waste]]<ref>[https://www.viridor.co.uk/energy/energy-recovery-facilities/lakeside-efw/ Viridor Website]</ref>. The construction of the third runway at [[wikipedia:Heathrow Airport|Heathrow Airport]] would have necessitated the movement of the facility, with plans submitted in June 2019 to Slough Borough Council <ref>[https://www.letsrecycle.com/news/latest-news/plans-for-replacement-lakeside-efw-submitted/ Letsrecycle article]</ref> most recently reported in late 2020 as withdrawn as an application in [[DEFRA]] data.


==History==
==History==
Line 10: Line 12:


==Plant==
==Plant==
Built by [[Itochu-Takuma]] under an [[EPC]]-turnkey contract and was delivered in January 2010 at a reported <ref>[https://www.mrw.co.uk/home/160m-lakeside-efw-taken-over-by-grundon/viridor-partnership/3006204.article MRW Article]</ref> £160m capital cost, comprising conventional moving grate combustion technology and generating a design output of 37MWe (vs the capacity of 30MWe listed).
Built by [[Itochu-Takuma]] under an [[EPC]]-turnkey contract and was delivered in January 2010 at a reported <ref>[https://www.mrw.co.uk/home/160m-lakeside-efw-taken-over-by-grundon/viridor-partnership/3006204.article MRW Article]</ref> £160m capital cost, comprising conventional moving [[grate]] [[combustion]] technology and generating a design output of 37MWe (vs the capacity of 30MWe listed).


==Local Authority Users==
{{EfWLAData|EPR={{#var: epr}}}}
The following data comes from [[WasteDataFlow]] for the financial year 2018/19 and represents those local authorities recorded as putting tonnage into the site (either directly or via a transfer station). The tonnage received cannot be directly compared with the stated historical tonnage received and recorded in the [[EA]] statistics as these are recorded on a calendar year basis (i.e. January 2018 to December 2018). A 'zero return' below indicates no local authority tonnage was recorded, most likely a result of the plant being recently commissioned and actually having received no tonnage. Equally, lower than expected tonnage maybe a result of either a new plant being in 'ramp up' towards full capacity after construction, or may be a result of plant shut down and subsequent re-start in a year.
 
{{#clear_external_data:}}
{{EAIn|EPR={{#var: epr}}}}
{{#get_db_data: db=engy
|from=wdfincin|where=epr='BT7116IW'|data=authority=authority,epr=epr,ton=ton}}
{|class="wikitable sortable"