Dundee EfW CHP Facility: Difference between revisions

Bin52 (talk | contribs)
m minor text changes
Northern Chick (talk | contribs)
Line 15: Line 15:
==Plant==
==Plant==


The facility is due to incorporate grate incineration technology with steam from the process due to be used as a source of heat for for near by Michelin tyre production factory (should it still be in operation once the facility becomes fully operational).
The facility is due to incorporate grate incineration technology with steam from the process due to be used as a source of heat for the near by Michelin tyre production factory (should it still be in operation once the facility becomes fully operational).


The building has been designed to measure 134m in length and 38m in height, with an exhaust stack measuring 90m.<ref>[https://www.letsrecycle.com/news/latest-news/mvv-secures-permission-for-dundee-erf Let's Recycle]/</ref>
The building has been designed to measure 134m in length and 38m in height, with an exhaust stack measuring 90m.<ref>[https://www.letsrecycle.com/news/latest-news/mvv-secures-permission-for-dundee-erf Let's Recycle]/</ref>