Dundee EfW CHP Facility: Difference between revisions
m add new link |
m minor text change |
||
| Line 11: | Line 11: | ||
==History== | ==History== | ||
Construction began on the new plant in 2018 and was due to be operational at the end of 2020, first waste was reported through hopper in March 2021<ref> | Construction began on the new plant in 2018 and was due to be operational at the end of 2020, first waste was reported through hopper in March 2021<ref>[https://www.linkedin.com/feed/update/urn:li:activity:6777665733691244544/?updateEntityUrn=urn%3Ali%3Afs_feedUpdate%3A%28V2%2Curn%3Ali%3Aactivity%3A6777665733691244544%29 Linked-in Post]</ref>. | ||
==Plant== | ==Plant== | ||