Baldovie and Dundee EfW: Difference between revisions

Northern Chick (talk | contribs)
Northern Chick (talk | contribs)
Line 11: Line 11:
==History==
==History==


The EFW plant at Baldovie was for many years the only municipal waste fired EfW plant in mainland Scotland. It suffered a major fire in 2012 and was later refurbished at a cost of £13.5m.<ref>https://www.endswasteandbioenergy.com/article/1292662/uk-separation-upgrades-unnecessary-dundee-efw-plant</ref>
The EFW plant at Baldovie was for many years the only municipal waste fired EfW plant in mainland Scotland. It suffered a major fire in 2012 and was later refurbished at a cost of £13.5m.<ref>[https://www.endswasteandbioenergy.com/article/1292662/uk-separation-upgrades-unnecessary-dundee-efw-plant ENDS]</ref>


It was previously owned and operated by Dundee Energy Recovery Ltd, a local authority owned company.
It was previously owned and operated by Dundee Energy Recovery Ltd, a local authority owned company.