Dundee EfW CHP Facility: Difference between revisions
New picture |
m →Plant |
||
| Line 21: | Line 21: | ||
The building has been designed to measure 134m in length and 38m in height, with an exhaust stack measuring 90m.<ref>[https://www.letsrecycle.com/news/latest-news/mvv-secures-permission-for-dundee-erf Let's Recycle]/</ref> | The building has been designed to measure 134m in length and 38m in height, with an exhaust stack measuring 90m.<ref>[https://www.letsrecycle.com/news/latest-news/mvv-secures-permission-for-dundee-erf Let's Recycle]/</ref> | ||
The design, construction and commissioning of the plant is to be undertaken by Standardkessel Baumgarte GmbH under a full turnkey engineering, procurement and construction (EPC) contract. | The design, construction and commissioning of the plant is to be undertaken by Standardkessel Baumgarte GmbH under a full turnkey engineering, procurement and construction (EPC) contract.<ref>[https://bioenergyinternational.com/technology-suppliers/standardkessel-baumgarte-receives-order-waste-energy-chp-plant-dundee Bioenergy International]</ref> | ||
==Local Authority Users== | ==Local Authority Users== | ||