This EfW facility is being built next door to the [[Baldovie]] EfW facility which will cease operations once this plant goes live.
This EfW facility is being built next door to the [[Baldovie]] EfW facility which will cease operations once this plant goes live.


The plant is being built as part of a contract between MVV and [[Dundee City Council]] and [[Angus Council]].
The plant is being built as part of a contract between [[MVV]] and [[Dundee City Council]] and [[Angus Council]].


==History==
==History==
Line 19: Line 19:
The building has been designed to measure 134m in length and 38m in height, with an exhaust stack measuring 90m.<ref>[https://www.letsrecycle.com/news/latest-news/mvv-secures-permission-for-dundee-erf Let's Recycle]/</ref>
The building has been designed to measure 134m in length and 38m in height, with an exhaust stack measuring 90m.<ref>[https://www.letsrecycle.com/news/latest-news/mvv-secures-permission-for-dundee-erf Let's Recycle]/</ref>


The design, construction and commissioning of the plant is to be undertaken by Standardkessel Baumgarte GmbH under a full turnkey engineering, procurement and construction (EPC) contract.<ref>[https://bioenergyinternational.com/technology-suppliers/standardkessel-baumgarte-receives-order-waste-energy-chp-plant-dundee Bioenergy International]</ref>
The design, construction and commissioning of the plant is to be undertaken by [[Standardkessel Baumgarte GmbH]] under a full turnkey engineering, procurement and construction ([[EPC]]) contract.<ref>[https://bioenergyinternational.com/technology-suppliers/standardkessel-baumgarte-receives-order-waste-energy-chp-plant-dundee Bioenergy International]</ref>


==Waste Input==
==Waste Input==

Revision as of 13:55, 27 April 2020

Dundee EfW CHP Facility
Dundee EfW CHP Facility


Error: no local variable "site" has been set.
Error: no local variable "status" has been set.
Site Location
Site Location

See Residual EfW → page for a larger UK Wide map.

Waste Licence Error: no local variable "epr" has been set.
Operator [[Error: no local variable "operator" has been set.]]
Region [[:Category:Error: no local variable "region" has been set.|Error: no local variable "region" has been set.]]
Operational Capacity Error: no local variable "cap" has been set.ktpa
Is site R1? Error: no local variable "r1" has been set.
When was R1 Granted? Error: no local variable "r1date" has been set.
What was the R1 value Error: no local variable "r1value" has been set.
Electrical Capacity Error: no local variable "mwe" has been set.MWe
Number of Lines Error: no local variable "line" has been set.
Number of Turbines Error: no local variable "turbine" has been set.
CHP Error: no local variable "chp" has been set.
Technology Approach Error: no local variable "techtype" has been set.
Funding Type [[Error: no local variable "funding" has been set.]]

Operators Annual Report


Input Data

Year HH C&I Clin RDF Total


Output Data

Year IBA IBA %ge of Tot IN APC APC %ge of Tot IN

Summary

An EfW facility based upon conventional combustion technology and presently in advanced construction. Dundee EfW CHP facility has a forecast operational capacity of 110,000 tonnes per annum, operated and owned by MVV. [1]

This EfW facility is being built next door to the Baldovie EfW facility which will cease operations once this plant goes live.

The plant is being built as part of a contract between MVV and Dundee City Council and Angus Council.

History

Construction began on the new plant in 2018 and is due to be operational at the end of 2020.

Plant

The facility is due to incorporate grate incineration technology with steam from the process due to be used as a source of heat for the near by Michelin tyre production factory (should it still be in operation once the facility becomes fully operational).

The building has been designed to measure 134m in length and 38m in height, with an exhaust stack measuring 90m.[2]

The design, construction and commissioning of the plant is to be undertaken by Standardkessel Baumgarte GmbH under a full turnkey engineering, procurement and construction (EPC) contract.[3]

Waste Input

The facility will processes primarily residual Household Waste and some Commercial Waste.