Lakeside EfW: Difference between revisions

Bin52 (talk | contribs)
m minor text change
No edit summary
Line 1: Line 1:
{{#vardefine: epr|BT7116IW}}
[[Category:EfW Plants]]
An [[EfW]] facility based upon conventional [[combustion]] technology and considered an [[ERF]] based on its [[R1]] status. [[Lakeside EfW]] has permitted operational capacity of 450,000 tonnes per annum, operated by [[Lakeside Energy from Waste Ltd]] a joint venture between [[Viridor]] and [[Grundon]]. Delivery of waste is by road, with a location close to the M25/M4 intersection, and the facility processes primarily residual [[Household Waste]] and [[Commercial Waste]]<ref>[https://www.viridor.co.uk/energy/energy-recovery-facilities/lakeside-efw/ Viridor Website]</ref>. The construction of the third runway at [[wikipedia:Heathrow Airport|Heathrow Airport]] would have necessitated the movement of the facility, with plans submitted in June 2019 to Slough Borough Council <ref>[https://www.letsrecycle.com/news/latest-news/plans-for-replacement-lakeside-efw-submitted/ Letsrecycle article]</ref> most recently reported in late 2020 as withdrawn as an application in [[DEFRA]] data.
{{EfWTemplate|EPR={{#var:epr}}|id=8}}
[[File:Viridor Lakeside.png|370px|left|Viridor Lakeside]]
[[File:Viridor Lakeside.png|370px|left|Viridor Lakeside]]
[[Category:EfW Plants]]
{{EfWTemplate|EPR=BT7116IW|id=8}}


==Summary==
==Summary==
Line 16: Line 20:
{{#clear_external_data:}}
{{#clear_external_data:}}
{{#get_db_data: db=engy
{{#get_db_data: db=engy
|from=wdfincin|where=epr='BT7116IW'|data=authority=authority,epr=epr,ton=ton}}
|from=wdfincin|where=epr='{{#var:epr}}'|data=authority=authority,epr=epr,ton=ton}}
{|class="wikitable sortable"
{|class="wikitable sortable"
! Authority
! Authority