High Temperature and Clinical Waste Incineration: Difference between revisions
Arctellion (talk | contribs) No edit summary |
m minor text change |
||
| Line 15: | Line 15: | ||
The following table summarises all [[High Temperature and Clinical Waste Incineration]] sites, excluding micro-scale plants and [[Pet Crematoriums]]. Of the sites listed, only one has recently opened ([[Haylers End Energy Recovery]]) and one is in construction for delivery in the summer of 2021 ([[Scotia Business Park]]). The largest High Temperature Incinerator site in the UK, and one of the most advanced in Europe<ref>[https://www.veolia.co.uk/sites/g/files/dvc1681/files/document/2014/11/HTI_BROCHURE_0.pdf Ellesmere Port Brochure]</ref>, is [[Veolia]]'s [[Ellesmere Port Incinerator]] which recently celebrated its 30th anniversary<ref>[https://www.veolia.co.uk/press-releases/veolia-high-temperature-incinerator-facility-marks-30-years-successful-operation Veolia Press Release September 2020]</ref>. | The following table summarises all [[High Temperature and Clinical Waste Incineration]] sites, excluding micro-scale plants and [[Pet Crematoriums]]. Of the sites listed, only one has recently opened ([[Haylers End Energy Recovery]]) and one is in construction for delivery in the summer of 2021 ([[Scotia Business Park]]). The largest High Temperature Incinerator site in the UK, and one of the most advanced in Europe<ref>[https://www.veolia.co.uk/sites/g/files/dvc1681/files/document/2014/11/HTI_BROCHURE_0.pdf Ellesmere Port Brochure]</ref>, is [[Veolia]]'s [[Ellesmere Port Incinerator]] which recently celebrated its 30th anniversary<ref>[https://www.veolia.co.uk/press-releases/veolia-high-temperature-incinerator-facility-marks-30-years-successful-operation Veolia Press Release September 2020]</ref>. | ||
Within the table below the headline plated capacity and tonnage received in 2019 is listed, with the type of site grouped | Within the table below the headline plated capacity, the total tonnage received in 2019 and the tonnage of [[Clinical Waste]] received in 2019 is listed, with the type of site grouped into 3 categories: | ||
*High Temperature Incinerators ('''HTI''') (4 sites) | *High Temperature Incinerators ('''HTI''') (4 sites) | ||
*Clinical Waste Incinerators ('''ClinIncin''') (18 sites plus 1 in construction) | *Clinical Waste Incinerators ('''ClinIncin''') (18 sites plus 1 in construction) | ||
*Incinerators that received [[Clinical Waste]] in 2019 and/or 2018 ('''Incin''') (21 sites) | *Incinerators that received [[Clinical Waste]] in 2019 and/or 2018 ('''Incin''') (21 sites plus 1 that received but transferred out in 2018) | ||
More detailed information can be found by clicking through to the site specific page from the table below: | More detailed information can be found by clicking through to the site specific page from the table below: | ||