Skelton Grange EfW Plant: Difference between revisions
mNo edit summary |
additional text |
||
| Line 7: | Line 7: | ||
The combined heat and power-enabled facility will process business and residential waste from across Yorkshire and the wider region and export power to the National Grid<ref name="bea" />. | The combined heat and power-enabled facility will process business and residential waste from across Yorkshire and the wider region and export power to the National Grid<ref name="bea" />. | ||
[[ | In January [[Enfinium]] [[Skelton Grange EfW Plant]] signed two long terms waste supply contracts for over 50% of the facility's annual capacity with Suez UK and [[Beauparc]], the latter with [[Residual Waste|residual waste]] from its AWM site which is situated a mile from the proposed location of the plant<ref name="bea"/>. [[Beauparc]] and [[Enfinium]] have previous history, working together on both the [[Ferrybridge Multifuel 1 (FM1)|FM1]] and [[Ferrybridge Multifuel 2 (FM2)|FM2]] developments with SSE plc at [[Ferrybridge Multifuel 1 (FM1)|Ferrybridge]]<ref name="bea" /> at Knottingley, west Yorkshire. Furter long term contracts were signed with [[Biffa]] and [[B&M Waste]] in June 2021<ref name ="Lets" />. | ||
==Plant== | |||
==References== | ==References== | ||
<references /> | <references /> | ||