An [[EfW]] facility based upon conventional [[combustion]] technology and presently in advanced construction. [[Dundee EfW CHP Facility]] has a forecast operational capacity of 110,000 tonnes per annum, operated and owned by [[MVV]]. <ref>[https://www.mvv.de/en/about-us/group-of-companies/mvv-umwelt/shareholdings/mvv-environment-ltd/baldovie-efw-chp-facility MVV]</ref>{{EfWTemplate|EPR={{#var:epr}}|id=153}}[[File:Dundee EFW build.jpg|280px|left|Dundee EfW CHP Facility]]__TOC__<br clear='left' />
An [[EfW]] facility based upon conventional [[combustion]] technology. [[Dundee EfW CHP Facility]] has a forecast operational capacity of 110,000 tonnes per annum, operated and owned by [[MVV]]. <ref>[https://www.mvv.de/en/about-us/group-of-companies/mvv-umwelt/shareholdings/mvv-environment-ltd/baldovie-efw-chp-facility MVV]</ref>{{EfWTemplate|EPR={{#var:epr}}|id=153}}[[File:Dundee EFW build.jpg|280px|left|Dundee EfW CHP Facility picture Standardkessel Baumgarte all rights reserved]]__TOC__<br clear='left' />


==Summary==
==Summary==
An [[EfW]] facility based upon conventional [[combustion]] technology and presently in advanced construction. [[Dundee EfW CHP Facility]] has a forecast operational capacity of 110,000 tonnes per annum, operated and owned by [[MVV]]. <ref>[https://www.mvv.de/en/about-us/group-of-companies/mvv-umwelt/shareholdings/mvv-environment-ltd/baldovie-efw-chp-facility MVV]</ref>
An [[EfW]] facility based upon conventional [[combustion]] technology reported in early March 2022 as handed over by the contractor for operation<ref>https://eswet.eu/sbg-handover-efw-waste-plant-dundee/</ref>. [[Dundee EfW CHP Facility]] has a forecast operational capacity of 110,000 tonnes per annum, operated and owned by [[MVV]]. <ref>[https://www.mvv.de/en/about-us/group-of-companies/mvv-umwelt/shareholdings/mvv-environment-ltd/baldovie-efw-chp-facility MVV]</ref>


This [[EfW] facility is being built next door to the [[Baldovie]] EfW facility which will cease operations once this plant goes live.
This [[EfW]] facility is being built next door to the [[Baldovie]] EfW facility which will cease operations once this plant goes live.


The plant is being built as part of a contract between [[MVV]] and [[Dundee City Council]] and [[Angus Council]].
The plant is being built as part of a contract between [[MVV]] and [[Dundee City Council]] and [[Angus Council]].


==History==
==History==
Construction began on the new plant in 2018 and was due to be operational at the end of 2020, first waste was reported through hopper in March 2021<ref>[https://www.linkedin.com/feed/update/urn:li:activity:6777665733691244544/?updateEntityUrn=urn%3Ali%3Afs_feedUpdate%3A%28V2%2Curn%3Ali%3Aactivity%3A6777665733691244544%29 Linked-in Post]</ref>.
Construction began on the new plant in 2018 and was due to be operational at the end of 2020, first waste was reported through hopper in March 2021<ref>[https://www.linkedin.com/feed/update/urn:li:activity:6777665733691244544/?updateEntityUrn=urn%3Ali%3Afs_feedUpdate%3A%28V2%2Curn%3Ali%3Aactivity%3A6777665733691244544%29 Linked-in Post]</ref> with operational handover completed in March 2022.


==Plant==
==Plant==
Line 17: Line 17:
The building has been designed to measure 134m in length and 38m in height, with an exhaust stack measuring 90m.<ref>[https://www.letsrecycle.com/news/latest-news/mvv-secures-permission-for-dundee-erf Let's Recycle]/</ref>
The building has been designed to measure 134m in length and 38m in height, with an exhaust stack measuring 90m.<ref>[https://www.letsrecycle.com/news/latest-news/mvv-secures-permission-for-dundee-erf Let's Recycle]/</ref>


The design, construction and commissioning of the plant is to be undertaken by [[Standardkessel Baumgarte GmbH]] under a full turnkey engineering, procurement and construction ([[EPC]]) contract.<ref>[https://bioenergyinternational.com/technology-suppliers/standardkessel-baumgarte-receives-order-waste-energy-chp-plant-dundee Bioenergy International]</ref>
The design, construction and commissioning of the plant was undertaken by [[Standardkessel Baumgarte GmbH]] under a full turnkey engineering, procurement and construction ([[EPC]]) contract.<ref>[https://bioenergyinternational.com/technology-suppliers/standardkessel-baumgarte-receives-order-waste-energy-chp-plant-dundee Bioenergy International]</ref>