==Plant== | ==Plant== | ||
The facility is due to incorporate grate incineration technology with steam from the process due to be used as a source of heat for for nearly Michelin tyre production factory. | The facility is due to incorporate grate incineration technology with steam from the process due to be used as a source of heat for for nearly Michelin tyre production factory (should it still be in operation once the facility becomes fully operational). | ||
The building has been designed to measure 134m in length and 38m in height, with an exhaust stack measuring 90m.<ref>[https://www.letsrecycle.com/news/latest-news/mvv-secures-permission-for-dundee-erf Let's Recycle]/</ref> | The building has been designed to measure 134m in length and 38m in height, with an exhaust stack measuring 90m.<ref>[https://www.letsrecycle.com/news/latest-news/mvv-secures-permission-for-dundee-erf Let's Recycle]/</ref> | ||