Dundee EfW CHP Facility: Difference between revisions

Northern Chick (talk | contribs)
mNo edit summary
Northern Chick (talk | contribs)
Line 14: Line 14:
==Plant==
==Plant==


The facility is due to incorporate grate incineration technology with steam from the process due to be used as a source of heat for for nearly Michelin tyre production factory.
The facility is due to incorporate grate incineration technology with steam from the process due to be used as a source of heat for for nearly Michelin tyre production factory (should it still be in operation once the facility becomes fully operational).


The building has been designed to measure 134m in length and 38m in height, with an exhaust stack measuring 90m.<ref>[https://www.letsrecycle.com/news/latest-news/mvv-secures-permission-for-dundee-erf Let's Recycle]/</ref>
The building has been designed to measure 134m in length and 38m in height, with an exhaust stack measuring 90m.<ref>[https://www.letsrecycle.com/news/latest-news/mvv-secures-permission-for-dundee-erf Let's Recycle]/</ref>