Viridor Lakeside
Viridor Lakeside


Lakeside EfW
Operational
Site Location
Site Location

See Residual EfW → page for a larger UK Wide map.

Waste Licence BT7116IW
Operator Viridor & Grundon Waste Management
Region South East
Operational Capacity 468ktpa
Is site R1? fal
When was R1 Granted? 2015-09-12
What was the R1 value 0.68
Electrical Capacity 37.00MWe
Number of Lines 2
Number of Turbines 1
CHP No
Technology Approach EfW
Funding Type PPP

Operators Annual Report


Input Data

Year HH C&I Clin RDF Total
2016 0.00 0.00 0.00 0.00 0.00
2017 0.00 0.00 0.00 0.00 0.00
2018 0.00 0.00 0.00 0.00 0.00
2019 0.00 0.00 0.00 0.00 0.00
2020 261967.00 155012.00 316.00 0.00 417791.00
2021 234494.00 157409.00 1163.00 0.00 393522.00
2022 255084.00 170094.00 12.00 0.00 425237.00
2023 247682.00 163285.00 1776.00 0.00 412802.00


Output Data

Year IBA IBA %ge of Tot IN APC APC %ge of Tot IN
2016 80033.40 0.00% 12653.58 0.00%
2017 81724.96 0.00% 12853.76 0.00%
2018 77619.00 0.00% 12478.00 0.00%
2019 76164.00 0.00% 12651.00 0.00%
2020 78462.00 18.78% 12422.00 2.97%
2021 73819.00 18.76% 11925.00 3.03%
2022 78342.00 18.42% 11156.00 2.62%
2023 75348.00 18.25% 11713.00 2.84%

Summary

An EfW facility based upon conventional combustion technology and considered an ERF based on its R1 status. Lakeside has permitted operational capacity of 450,000 tonnes per annum, operated by Lakeside Energy from Waste Ltd a joint venture between Viridor and Grundon. Delivery of waste is by road, with a location close to the M25/M4 intersection, and the facility processes primarily residual Household Waste and Commercial Waste[1]. The construction of the third runway at Heathrow Airport will necessitate the movement of the facility, with plans submitted in June 2019 to Slough Borough Council [2].

History

The Lakeside facility was built to service a number of local authorities in the region, originally including Poole, Wiltshire, RE3 Partnership (comprising the Berkshire authorities of Bracknell, Wokingham and Reading) and WLWA (before its contract to send material to Avonmouth), with anticipated total throughput of up to 440,000 tonnes per annum - receiving additional residual Commercial Waste to those authorities listed below.

Plant

Built by Itochu-Takuma under an EPC-turnkey contract and was delivered in January 2010 at a reported [3] £160m capital cost, comprising conventional moving grate combustion technology and generating a design output of 37MWe (vs the capacity of 30MWe listed).

Local Authority Users

The following represents those local authorities recorded as putting tonnage into the site (either directly or via a transfer station). The tonnage received cannot be directly compared with the stated historical tonnage received and recorded in the EA statistics as these are recorded on a calendar year basis (i.e. January 2018 to December 2018). A 'zero return' below indicates no local authority tonnage was recorded, most likely a result of the plant being recently commissioned and actually having received no tonnage. Equally, lower than expected tonnage maybe a result of either a new plant being in 'ramp up' towards full capacity after construction, or may be a result of plant shut down and subsequent re-start in a year.


Authority Tonnage
Bournemouth, Christchurch and Poole Council 1855.620
Bracknell Forest Borough Council 15551.460
Bromley LB 353.200
Carmarthenshire County Council 62.950
Ceredigion County Council 7.600
Derby City Council 311.040
Derbyshire County Council 39.980
Hertfordshire County Council 428.480
Monmouthshire CC 25.040
Pembrokeshire County Council 33.440
Reading Borough Council 24821.000
Rhondda Cynon Taff CBC 1130.580
Royal Borough of Kingston upon Thames 164.102
Slough Borough Council 44691.570
Swindon Borough Council 308.520
West Berkshire District Council 95.040
West London Waste Authority 86651.730
West Sussex County Council 6679.140
Wiltshire 44186.540
Wokingham Council 25755.960

References