Baldovie and Dundee EfW

From Wikiwaste
Revision as of 10:42, 4 May 2021 by Arctellion (talk | contribs)

In Nov 2017, MVV entered into a contract with Dundee City Council and Angus Council to take over and operate this existing energy from waste facility whilst building a new, modern facility next door (Dundee EfW CHP Facility).[1].

Error: no local variable "site" has been set.
Error: no local variable "status" has been set.
Site Location
Site Location

See Residual EfW → page for a larger UK Wide map.

Waste Licence Error: no local variable "epr" has been set.
Operator [[Error: no local variable "operator" has been set.]]
Region [[:Category:Error: no local variable "region" has been set.|Error: no local variable "region" has been set.]]
Operational Capacity Error: no local variable "cap" has been set.ktpa
Is site R1? Error: no local variable "r1" has been set.
When was R1 Granted? Error: no local variable "r1date" has been set.
What was the R1 value Error: no local variable "r1value" has been set.
Electrical Capacity Error: no local variable "mwe" has been set.MWe
Number of Lines Error: no local variable "line" has been set.
Number of Turbines Error: no local variable "turbine" has been set.
CHP Error: no local variable "chp" has been set.
Technology Approach Error: no local variable "techtype" has been set.
Funding Type [[Error: no local variable "funding" has been set.]]

Operators Annual Report


Input Data

Year HH C&I Clin RDF Total


Output Data

Year IBA IBA %ge of Tot IN APC APC %ge of Tot IN

Baldovie EfW
Baldovie EfW


Summary

In Nov 2017, MVV entered into a contract with Dundee City Council and Angus Council to take over and operate this existing energy from waste facility whilst building a new, modern facility next door (Dundee EfW CHP Facility).[2].

The facility first began operations in 1994 and receives 120,000 tonnes of waste a year collected from Dundee, Angus and Aberdeenshire areas. The facility primarily accepts Municipal Solid Waste and Household Waste but does allow some Commercial Waste to be treated.

The plant is due to close when the new facility Dundee EfW CHP Facility becomes fully operational.

History

The EFW plant at Baldovie was for many years the only municipal waste fired EfW plant in mainland Scotland. It suffered a major fire in 2012 and was later refurbished at a cost of £13.5m.[3]

It was previously owned and operated by Dundee Energy Recovery Ltd, a local authority owned company and formed part of a PFI with Dundee City Council.

Plant

The incineration process carried out by the plant handles mainly Household Waste and Commercial Waste in two 17 MW thermal input bubbling fluidised bed boilers (which at the time were the first in operation in the UK). The plant generates 10.5 MWe of electrical output with 8.3 MWe exported to the National Grid. The plant is designed to treat 120,000 tonnes of waste per year with each boiler capable of burning waste at a nominal design rate of 7.6 tonnes/hr per boiler.[4]

Local Authority Users

Local Authority Data

The table below lists those local authorities who have recorded their tonnage on WasteDataFlow as sending their Waste to this site (either directly or via a transfer station) for the most recent financial year, data was updated on Error: no local variable "updated" has been set.. The tonnage received cannot be directly compared with the stated historical tonnage received and recorded in the EA statistics as these are recorded on a calendar year basis (i.e. January 2018 to December 2018). The total Local Authority waste received by the plant in the period was: 0t

A 'zero return' or a below expected return, when compared to the EA Data below indicates that either:

  • no local authority tonnage was recorded/no tonnage was sent to the site in the period (but has been listed as it may have previously received tonnage from a local authority) or
  • a result of the plant being recently commissioned and actually having received no tonnage or
  • a lower than expected tonnage maybe a result of a local authority splitting their tonnage over multiple sites, having less tonnage to send than might be anticipated or
  • it may be a new plant being in 'ramp up' towards full capacity after construction or
  • may be a result of plant shut down and subsequent re-start in a year or
  • the local authority may not have correctly entered the site's details on WasteDataFlow


Authority Tonnage

References