Severnside Energy Recovery Centre: Difference between revisions
Arctellion (talk | contribs) Updated to new format |
Arctellion (talk | contribs) No edit summary |
||
| (One intermediate revision by the same user not shown) | |||
| Line 2: | Line 2: | ||
[[Category:EfW Plants]] | [[Category:EfW Plants]] | ||
An [[EfW]] facility based upon conventional combustion technology and considered an [[ERF]] based on its [[R1]] status. Severnside ERC (also known as SERC) has a permitted operational capacity of 400,000 tonnes per annum, and is owned and operated by [[West London Energy Recovery Ltd]] a company set up for the purpose by [[Suez]]. Delivery of waste is primarily by rail and the facility processes primarily residual [[Household Waste]] and some [[Commercial Waste]]. {{EfWTemplate|EPR={{#var:epr}}|id=12}} | An [[EfW]] facility based upon conventional combustion technology and considered an [[ERF]] based on its [[R1]] status. Severnside ERC (also known as SERC) has a permitted operational capacity of 400,000 tonnes per annum, and is owned and operated by [[West London Energy Recovery Ltd]] a company set up for the purpose by [[Suez]]. Delivery of waste is primarily by rail and the facility processes primarily residual [[Household Waste]] and some [[Commercial Waste]]. {{EfWTemplate|EPR={{#var:epr}}|id=12}} | ||
[[File:Suez Severside.png|350px|left|Suez Severnside (SERC) Site]]__TOC__ | [[File:Suez Severside.png|350px|left|Suez Severnside (SERC) Site]]__TOC__ | ||
<br clear='left' /> | <br clear='left' /> | ||
==Summary== | ==Summary== | ||
| Line 18: | Line 16: | ||
The plant comprises 2 lines of 21.85 tonnes/hour (maximum 24.24 tonnes/hour) design capacity capable of treating 350,000 tonnes per annum via standard combustion technology, air cooled, Hitachi Zosen Inova Grate, generating super-heated steam. It is configured to run on residual [[Household Waste]] and [[Commercial Waste]] with a [[CV]] of between 7.5 and 12.5MJ/kg to deliver 37.5MWe of power <ref>[https://www.hz-inova.com/projects/severnside-uk/ Hitachi Zosen Inova Website]</ref>. Operating at the maximum design tonnes/ hour figure would result in a capacity close to 400,000 tonnes per annum, but this would require a low [[CV]]. | The plant comprises 2 lines of 21.85 tonnes/hour (maximum 24.24 tonnes/hour) design capacity capable of treating 350,000 tonnes per annum via standard combustion technology, air cooled, Hitachi Zosen Inova Grate, generating super-heated steam. It is configured to run on residual [[Household Waste]] and [[Commercial Waste]] with a [[CV]] of between 7.5 and 12.5MJ/kg to deliver 37.5MWe of power <ref>[https://www.hz-inova.com/projects/severnside-uk/ Hitachi Zosen Inova Website]</ref>. Operating at the maximum design tonnes/ hour figure would result in a capacity close to 400,000 tonnes per annum, but this would require a low [[CV]]. | ||
{{EfWLAData|EPR={{#var: epr}}}} | {{EfWLAData|EPR={{#var: epr}}}} | ||
{{EAIn|EPR={{#var: epr}}}} | |||
==References== | ==References== | ||
<references /> | <references /> | ||